Page 4
• Attach the Intermediate
Baluster to the bottom
Universal Rail using the
#10x2” screw.
• Attach provided foot
blocks to the underside
of one Universal rail by
counter-boring the foot
block and using the
#10x2” screws.
DETERMINE
INTERMEDIATE
BALUSTER LOCATION
ATTACH
INTERMEDIATE
BALUSTER AND FOOT
BLOCKS
3
4
• Use the Intermediate
Base Plate of the
Intermediate Baluster as
a template on the bottom
Universal Rail.
1’ to 6’ on center requires 1 Intermediate
Balusters.
Pre-drilled hole will be offset from the
centerline.
6’ to 8’ on center requires 2 Intermediate
Balusters.
Be sure the screw finds the screw chase.
For easier installation, pre-drill screw chase with a 3/16” drill bit.
For sections up to 6’: Place two Foot Blocks at 1/3 intervals on the rail.
For sections 6’ to 8’: Space three Foot Blocks approximately at 1/4 intervals on the rail.
Bore 1/2”
Drill 3/16”
Hole
2 1/2”
Foot Block Preparation
Screw Chase
Pre-Drill center hole 3/16”
Pre-Drill 9/64” into Universal Rail
#10 x 2” Coated Screws
#10 x 2”
Stainless
Screws
Installing Evolutions Rail
TM
Contemporary
with CableRail by Feeney
®