Page 6
ATTACH BOTTOM UNIVERSAL
RAIL AND TRANSFER HOLE
LOCATION ONTO POST SLEEVE
TRIM TOP RAIL
AND SECURE TOP
UNIVERSAL RAIL
7
8
• Set the bottom Universal
railing into place and
Pre-Drill pilot holes
through the Post Sleeve
and into the post through
the bracket holes.
Secure with #10x2”
screws.
• Use an extra
Intermediate Baluster
as a template for the
CableRail hardware and
through holes. Use a
3/16” drill bit to transfer
your marks to the Post
Sleeves.
• Attach Intermediate
Baluster to the underside
of the top Universal Rail
with 2 #10x1” screws.
#10 x 1”
Stainless
Screws
Pre-Drill 3/16
Pre-Drill 9/64”
#10 x 2”
Coated Screws
Installing Evolutions Rail
TM
Contemporary
with CableRail by Feeney
®