Page 5
• Temporarily install top
Universal Rail.
• Mark the height of the
Post Sleeves.
• Cut your Post Sleeves and
posts to desired length.
• Place the Post Sleeves
over the 4x4” posts.
• Slide Post Skirts over
Post Sleeves.
ATTACH BASE PLATE TO
INTERMEDIATE BALUSTER
MEASURE AND CUT
POST SLEEVES
5
6
• Place the bottom
Universal Rail and allow
the rail to rest on its foot
blocks.
• Attach base plate to the
Intermediate Baluster.
Post Sleeves should be flush with the top
Universal Rail.
a
c
b
#10 x 1”
Stainless
Screws
Pre-Drill 3/16”
into Intermediate
Baluster
Installing Evolutions Rail
TM
Contemporary
with CableRail by Feeney
®