
4-6
Chapter 4. Monitoring
4 - 2
Method of Operation
How to operate the Numeric Monitor screen
z
Start of monitoring (start of communications)
The operation described below is required to start monitoring.
Otherwise, it is not possible to monitor or rewrite data.
• Click the
icon.
Selecting
[Numeric Monitor]
→
[Numeric Monitor Start]
gives the same result.
>> Normal state: The data in the controller is displayed.
Abnormal state: A message saying “Connected instruments may not be
supported by this loader. Check the listing.” is displayed.
Chapter 6. Troubleshooting (p. 6-1)
(for corrective
action)
The following operations are possible when the controller and loader are correctly
connected:
Summary of Contents for SLPC1F
Page 12: ......
Page 24: ......
Page 37: ...4 5 Chapter 4 Monitoring Canceling the zoomed graph Drag from lower right to upper left...
Page 46: ......
Page 80: ......
Page 81: ...Revision History of CP SP 1463E Date Rev New Page No Description July 2022 1...
Page 82: ......
Page 83: ......