background image

Terms and Conditions

We would like to express our appreciation for your purchase and use of Azbil Corporation's products. 

You are required to acknowledge and agree upon the following terms and conditions for your purchase of Azbil Corporation's 

products (system products, field instruments, control valves, and control products), unless otherwise stated in any separate 

document, including, without limitation, estimation sheets, written agreements, catalogs, specifications and instruction manuals. 

1.  Warranty period and warranty scope

1.1  Warranty period

Azbil Corporation's products shall be warranted for one (1) year from the date of your purchase of the said products or 

the delivery of the said products to a place designated by you.

In the case of products that Azbil Corporation has repaired for a fee, the repaired part only shall be warranted for three (3) 

months from the time of delivery to the location designated by the customer. 

1.2  Warranty scope

In the event that Azbil Corporation's product has any failure attributable to azbil during the aforementioned warranty 

period, Azbil Corporation shall, without charge, deliver a replacement for the said product to the place where you 

purchased, or repair the said product and deliver it to the aforementioned place. 

Notwithstanding the foregoing, any failure falling under one of the following shall not be covered under this warranty: 

(1)  Failure caused by your improper use of azbil product  

(noncompliance with conditions, environment of use, precautions, etc. set forth in catalogs, specifications, 

instruction manuals, etc.); 

(2)  Failure caused for other reasons than Azbil Corporation's product;

(3)  Failure caused by any modification or repair made by any person other than Azbil Corporation or Azbil 

Corporation's subcontractors;  

(4)  Failure caused by your use of Azbil Corporation's product in a manner not conforming to the intended usage of 

that product; 

(5)  Failure that the state-of-the-art at the time of Azbil Corporation's shipment did not allow Azbil Corporation to 

predict; or 

(6)  Failure that arose from any reason not attributable to Azbil Corporation, including, without limitation, acts of God, 

disasters, and actions taken by a third party. 

Please note that the term "warranty" as used herein refers to equipment-only-warranty, and Azbil Corporation shall not 

be liable for any damages, including direct, indirect, special, incidental or consequential damages in connection with or 

arising out of Azbil Corporation's products. 

2.  Ascertainment of suitability 

You are required to ascertain the suitability of Azbil Corporation's product in case of your use of the same with your 

machinery, equipment, etc. (hereinafter referred to as "Equipment") on your own responsibility, taking the following 

matters into consideration: 

(1)  Regulations and standards or laws that your Equipment is to comply with.

(2)  Examples of application described in any documents provided by Azbil Corporation are for your reference 

purpose only, and you are required to check the functions and safety of your Equipment prior to your use. 

(3)  Measures to be taken to secure the required level of the reliability and safety of your Equipment in your use 

Although azbil is constantly making efforts to improve the quality and reliability of Azbil Corporation's 

products, there exists a possibility that parts and machinery may break down. 

You are required to provide your Equipment with safety design such as fool-proof design, *1 and fail-safe 

design*2 (anti-flame propagation design, etc.), whereby preventing any occurrence of physical injuries, fires, 

significant damage, and so forth. Furthermore, fault avoidance, *3 fault tolerance,*4 or the like should be 

incorporated so that the said Equipment can satisfy the level of reliability and safety required for your use. 

*1. A design that is safe even if the user makes an error. 

*2. A design that is safe even if the device fails. 

*3. Avoidance of device failure by using highly reliable components, etc. 

*4. The use of redundancy. 

3.  Precautions and restrictions on application 

Azbil Corporation's products other than those explicitly specified as applicable (e.g. azbil Limit Switch For Nuclear Energy) 

shall not be used in a nuclear energy controlled area (radiation controlled area). 

Any Azbil Corporation's products shall not be used for/with medical equipment. 

The products are for industrial use. Do not allow general consumers to install or use any Azbil Corporation's product. 

However, azbil products can be incorporated into products used by general consumers. If you intend to use a product for 

that purpose, please contact one of our sales representatives. 

In addition, 

you are required to conduct a consultation with our sales representative and understand detail specifications, cautions 

for operation, and so forth by reference to catalogs, specifications, instruction manual, etc. in case that you intend to use 

azbil product for any purposes specified in (1) through (6) below. 

Moreover, you are required to provide your Equipment with fool-proof design, fail-safe design, anti-flame propagation 

design, fault avoidance, fault tolerance, and other kinds of protection/safety circuit design on your own responsibility to 

ensure reliability and safety, whereby preventing problems caused by failure or nonconformity. 

(1)  For use under such conditions or in such environments as not stated in technical documents, including catalogs, 

specification, and instruction manuals 

(2)  For use of specific purposes, such as: 

*   Nuclear energy/radiation related facilities  

[For use outside nuclear energy controlled areas] [For use of Azbil Corporation's Limit Switch For Nuclear 

Energy] 

*  Machinery or equipment for space/sea bottom 

Summary of Contents for MVF Series

Page 1: ...product This manual contains information for ensuring the correct use of this prod uct It also provides necessary informa tion for installation maintenance and troubleshooting This manual should be re...

Page 2: ...hout notice Considerable effort has been made to ensure that this manual is free from inaccuracies and omissions If you should find an error or omission please contact the azbil Group In no event is A...

Page 3: ...manual uses the icons and conventions listed below Use caution when handling the product The indicated action is prohibited Always follow the indicated instructions Handling precautions Handling Preca...

Page 4: ...or use a throttle valve or the like to control the flowrate If the velocity exceeds the maximum measurable velocity both the flowrate display and the output voltage current may indicate considerably...

Page 5: ...nce Doing so might damage this device The Role of This Manual A total of 2 different manuals are available for the MVF Series Read them as necessary for your specific require ments If a manual you req...

Page 6: ...TS on this device Chapter 3 INSTALLATION MOUNTING WIRING This chapter describes installation mounting and wiring on this device Chapter 4 TROUBLESHOOTING This chapter describes how to investigate and...

Page 7: ...n 7 Behavior when the flowrate greatly exceeds the upper limit of flowrate 7 Precautions for piping installation 7 Piping work 10 Wiring 12 Chapter 4 TROUBLESHOOTING Nothing on display 16 Error messag...

Page 8: ......

Page 9: ...m square and 0 5 mm thick made possible by silicon micro machining and thin film technolo gies By using this high sensitivity high speed sensor to detect vortex frequency measurement rangeability of 1...

Page 10: ...to 20 mAdc output Integration pulse output 1 Power 24 Vdc 1 RS 485 communications 0 Horizontal Flow direction left to right Converter on top 2 1 Horizodntal Flow direction left to right Converter on b...

Page 11: ...dc output Integration pulse output 1 Power 24 Vdc 1 RS 485 communications 0 Horizontal Flow direction left to right Converter on top 2 1 Horizodntal Flow direction left to right Converter on bottom 2...

Page 12: ...es model number range and pulse rate Check that they are the same as the specifications ordered Converter Calculates temperature and pressure correction etc Wiring port There are 2 wiring ports Used f...

Page 13: ...more Upper 7 segment display Displays instantaneous flow rate Example 10000 0 m3 h Lower 7 segment display Displays integrated flow rate Example MVF050 1000000 0 m3 MVF080 100 150 10000000 m3 Station...

Page 14: ...ne could be injured by flying parts Caution Be sure to use this device for a flow not exceeding 36m s the maximum measurable velocity To pre vent excessive flow use a suitable means to control the sup...

Page 15: ...splay will stop increasing in proportion to the flowrate Be sure to use this device within the maximum measurable velocity If the velocity exceeds 50 m s the flowrate display will begin to decrease gi...

Page 16: ...ngle plane double 90 bend 10D min 5D min Flow direction Pipe with threedimen sional double 90 bend 20D min 5D min Flow direction If the oil water or dust is contained in a fluid install a device to re...

Page 17: ...ation damp ing device muffler between the pump or roots blower and this device to suppress the influence of pulsation as much as possible If the device is installed downstream of branched piping it ma...

Page 18: ...cause leak age or measurement error Be sure to flush cleaning the inside of pipe before installation this device to eliminate any foreign matter which might exist inside the pipe When installing pay...

Page 19: ...more a little at a time Tighten bolts within the specified tightening torque Otherwise the bolts may be damaged Do not forcibly insert into the narrow space between the flange faces Doing so might ca...

Page 20: ...the same electrical conduit There are two wiring methods direct cable lead out and use of an electrical wiring conduit When installing the device outdoors be sure to use a conduit Tools required Phill...

Page 21: ...diameter 6 Connect the wiring to the terminal block 7 Put the terminal cover back in place Procedure for using an electrical wiring conduit The wiring port thread is G1 2 1 Specify the wiring port Han...

Page 22: ...ax Input Load Load Power for load Handling precautions Connect COM of 4 20 mA output directly from the terminal block Do not use the COM of power supply terminal 4 20 mA and the COM of pulse output te...

Page 23: ...rm contact area Use crimp type terminal lugs applicable to M4 screw Be sure that the tightening torque of terminal screw is less than 0 8 N m Use the JIS C 3401 cables for control CVV etc of less than...

Page 24: ...dhered to the sensor Er04 Pressure sensor The cause may be an error or burnout of the pressure compensating sensor Er05 Flow sensor Pressure sensor The cause may be an error or burnout of the flow sen...

Page 25: ...mit alarm Pressure lower limit alarm AL 13 Flowrate upper limit alarm Temperature upper limit alarm Pressure lower limit alarm AL 16 Pressure upper limit alarm AL 17 Flowrate upper limit alarm Pressur...

Page 26: ...20 mAdc Allowable load resistance 600 max Maximum Current value 23 2 mA Integrated pulse output 1 point Open collector output Absolute maximum rating 30 Vdc 20 mA max Pulse weight MVF050 0 01 0 1 1 1...

Page 27: ...display becomes 00000000 after counting up to 99999999 For details about setup refer to MVF050 080 100 150 Micro Flow Vortex Gas Flowmeter User s Manual for Communications manual No CP SP 1183E 8 The...

Page 28: ...easured down to 5 2 m3 h Next we can calculate the minimum mass flow rate Qnormal m3 h normal at 0 C and pressure of 101 3 kPa with temperature and pressure correction Qnormal m3 h normal 5 2 273 0 27...

Page 29: ...low rate volumetric flow rate calculation Qactual m3 h 100 273 23 273 0 101 3 101 3 700 13 7 Volumetric flow rate Velocity calculation Velocity V m s Qactual m3 h S 3600 13 7 78 10 3 2 4 3600 0 8 S fl...

Page 30: ...umber is 15000 or less 4 RD when velocity is 0 5 m s or more and the Reynolds number is from 15000 to 35000 2 RD when the Reynolds number is 35000 or more MVF80 pipe size 80A Qmin minimum measurable f...

Page 31: ...13 Q 516 0 90 2 3 2 3 Q 4 4 Q 8 8 Q 234 0 90 5 2 5 2 Q 9 9 Q 12 12 Q 516 0 98 2 3 2 3 Q 4 4 Q 8 8 Q 234 0 98 5 2 5 2 Q 9 9 Q 11 11 Q 516 MVF100 Pipe size 100A MVF150 Pipe size 150A Operating pressure...

Page 32: ...min 4 7 RD 3 1 RD 0 05 11 0 Q min 4 7 RD 3 1 RD 7 4 Q 32 32 Q 74 74 Q 322 11 0 Q 31 31 Q 110 110 Q 711 0 1 7 4 Q min 4 6 RD 3 0 RD 0 1 11 0 Q min 4 6 RD 3 0 RD 7 4 Q 32 32 Q 74 74 Q 428 11 0 Q 31 31 Q...

Page 33: ...4 7 RD 3 2 RD 0 3 18 9 Q min 4 7 RD 3 2 RD 8 5 Q 32 32 Q 74 74 Q 854 18 9 Q 31 31 Q 110 110 Q 1886 MVF1003 MVF1503 Operating pressure MPa Minimum measurable flow rate Q min Accuracy Operating pressure...

Page 34: ...51 0 Q min 4 6 RD 3 0 RD 23 0 Q 38 38 Q 74 74 Q 2302 51 0 Q 85 85 Q 110 110 Q 5081 MVF1000 MVF1500 Operating pressure MPa Minimum measurable flow rate Q min Accuracy Operating pressure MPa Minimum mea...

Page 35: ...00 16000 18000 16 0 14 0 12 0 10 0 8 0 6 0 4 0 2 0 0 0 Pressure loss kPa Flow rate m h normal 3 When the MVF is used for a gas other than air multiply by the appropriate specific gravity below Specifi...

Page 36: ...External dimensions MVF050_S Pipe size 50A Unit mm 117 50 127 61 96 52 5 44 351 130 208 59 70 MVF080_S Pipe size 80A 117 50 127 61 126 60 367 130 208 59 70 78 28 Chapter 5 SPECIFICATIONS...

Page 37: ...A L I V E C O V E R MUST BE KE PT T I G H T 117 50 127 61 96 44 351 130 208 59 70 52 5 MVF080_C Pipe size 80A ADE IN JAPAN W H I L E C I R C U I T S A R E A L I V E C O V E R MUST BE KEPT T I G H T 1...

Page 38: ...MVF100_S Pipe size 100A 117 50 127 61 151 71 5 400 130 208 59 80 96 8 MVF150_S Pipe size 150A 117 50 127 61 212 142 100 428 130 208 59 120 Eyebolt 30 Chapter 5 SPECIFICATIONS...

Page 39: ...MVF100_C Pipe size 100A 399 70 5 40 100 117 50 127 61 59 130 208 151 96 8 MVF150_C Pipe size 150A 212 142 Eyebolt 127 61 99 427 117 50 130 208 59 140 60 31 Chapter 5 SPECIFICATIONS...

Page 40: ......

Page 41: ...Old pages are 11 to 13 Old pages are 14 and 15 Contact rating changed to Absolute maximum rating Pulse width added to pulse output Old page is 16 One atmospheric pressure changed to 101 3kPa Old page...

Page 42: ...he following matters into consideration 1 Regulations and standards or laws that your Equipment is to comply with 2 Examples of application described in any documents provided by Azbil Corporation are...

Page 43: ...cations or instruction manuals System products field instru ments sensors such as pressure flow level sensors regulating valves etc will reach the end of their life due to aged deterioration of parts...

Page 44: ...09 Specifications are subject to change without notice 1 12 2 Kawana Fujisawa Kanagawa 251 8522 Japan URL http www azbil com 1st edition Sep 2005 W 6th edition Dec 2013 F...

Reviews: