Assembly
12
15. Locate the dust defectors and brackets (5), six Hex bolts (h)
(short) and six 5/16" nuts (j). Line up the three holes in one of
the brackets with the pre-drilled holes in the deflector, intro-
duce the Hex bolts (h) through the holes and secure in place
with the 5/16" nuts (j), see fig 33-34-35.
Fig 33-34-35
5
16. Locate two Hex bolts (i) (long) and four 5/16" nuts (j). Line
up the holes in the tube support angle bracket (3) with the
threaded holes to the side of the extractor’s housing and secure
in place with two Hex bolts (i), see fig 36-37.
Fig 36-37
i
h
3
17. Slot the dust defector assembly up through the centre of
collector (12), introduce the two pre-drilled holes in the angle
bracket over the threaded studs (i) and secure in place with two
5/16"nuts (j), see fig 38-39-40.
NOTE: Make sure the bracket is angled down wards.
Threaded studs
Fig 38-39-40
Dust defector
j