8
INSTRUCTION MANUAL
_____________________________________________________________________________________________________________________
8.
Balance start
Connecting of supply plug to socket of ~230V/50Hz installation with unloaded
balance will cause the following sequence of actions:
Display test
Tests of basic electronic subassemblies,
ended with messages:
C1, C-2, ... C-6
.
Displaying of software version.
Ready for operation.