•
(Optional) Power control device(s)
Setting up your network
The MergePoint Unity switching system uses IP addresses to uniquely identify the switch and
the target devices. The MergePoint Unity switch family supports both Dynamic Host
Configuration Protocol (DHCP) and static IP addressing. Avocent recommends that IP addresses
be reserved for each switch and that they remain static while the switches are connected to the
network.
For additional information on setting up the MergePoint Unity switch using the DSView 3
software, and for information on how the MergePoint Unity switch uses TCP/IP, see the
DSView 3 Installer/User Guide.
Rack Mounting a MergePoint Unity Switch
A rack mounting kit is supplied with each MergePoint Unity switch. You may either place the
MergePoint Unity switch on the rack shelf or mount the switch directly into an Electronic
Industries Alliance (EIA) standard rack.
Most MergePoint Unity switches may be rack mounted in a 1U configuration. The MergePoint
Unity switch family does not support a 0U configuration.
Rack mounting safety considerations
•
Rack Loading: Overloading or uneven loading of racks may result in shelf or rack failure,
causing damage to equipment and possible personal injury. Stabilize racks in a permanent
location before loading begins. Mount components beginning at the bottom of the rack,
then work to the top. Do not exceed your rack load rating.
•
Power Considerations: Connect only to the power source specified on the unit. When
multiple electrical components are installed in a rack, ensure that the total component
power ratings do not exceed circuit capabilities. Overloaded power sources and extension
cords present fire and shock hazards.
•
Elevated Ambient Temperature: If installed in a closed rack assembly, the operating
temperature of the rack environment may be greater than room ambient. Use care not to
exceed the rated maximum ambient temperature of the switch.
•
Reduced Air Flow: Install the equipment in the rack so that the amount of airflow required
for safe operation of the equipment is not compromised.
•
Reliable Earthing: Maintain reliable earthing of rack mounted equipment. Pay particular
attention to supply connections other than direct connections to the branch circuit (for
example, use of power strips).
8
MergePoint Unity® Switch Installer/User Guide
Summary of Contents for MergePoint Unity
Page 1: ...MERGEPOINT UNITY SWITCH Installer User Guide...
Page 24: ...16 MergePoint Unity Switch Installer User Guide...
Page 46: ...38 MergePoint Unity Switch Installer User Guide...
Page 96: ...88 MergePoint Unity Switch Installer User Guide...
Page 97: ...590 883 501C For Technical Support www avocent com support...