- 33 -
The schedule allows you to control the power outlet or turn ON/ OFF/ RESET at assigned time
Adding a scheduled event
1. Select the action Duration :
There are 3 setting - Once , Every Day . Every Week
2. Select the Date by click the space and it will shoe out the calendar
Select a specific date range where the device will repeat the desired actions during the
time specified.
3. Select the Time period.
4. Choose the Action : Enable power # by chuck in the square , select power action as
One the scheduler has been setup , hit the
“ ADD No.:X Power Schedule “ button and you will
see your setting located on the bottom of the Action section .