Delivery Contents
AVENTICS
| PROFINET-IO | R412015162–BDL–001–AE
69
English
During commissioning
W
Installation may only be performed in a voltage-free and
pressure-free state and only by a qualified technician. In
order to avoid accidents caused by dangerous movements
of the actuators, electrical commissioning may only be
carried out in a pressure-free state.
W
Do not put the system into operation before it is completely
assembled as well as correctly wired and configured, and
after it has been tested.
W
The device is subject to the restrictions of the IP65
protection class. Before commissioning, make sure that all
the connection seals and plugs are leaktight to prevent
fluids and foreign bodies from penetrating the device.
During operation
W
Make sure that there is a sufficient exchange of air or
enough cooling if your valve system has any of the following:
– Full equipment status
– Continuously loaded solenoid coils
During cleaning
W
Never use solvents or strong detergents. Only clean the
device using a slightly damp cloth. Only use water and,
if necessary, a mild detergent.
3
Delivery Contents
The following is included in the delivery contents of a configured
valve system:
W
1 valve system according to configuration and order
W
1 set of operating instructions for the valve system
W
1 set of operating instructions for the bus coupler
The following is included in the delivery contents of a bus
coupler parts kit:
W
1 bus coupler with seal and two tie rods
W
1 set of operating instructions for the bus coupler
The VS is individually configured. You can find the exact
configuration in the AVENTICS Internet configurator under
your order number.
Summary of Contents for PROFINET-IO
Page 2: ......
Page 114: ...Disposal 114 AVENTICS PROFINET IO R412015162 BDL 001 AE...
Page 174: ...Elimination des d chets 174 AVENTICS PROFINET IO R412015162 BDL 001 AE...
Page 236: ...ndice 236 AVENTICS PROFINET IO R412015162 BDL 001 AE...
Page 347: ...Nyckelordsregister AVENTICS PROFINET IO R412015162 BDL 001 AE 347 Svenska...