
• Two Dell A7 ReadyRails II sliding rail assemblies — (1)
• Two hook and loop straps — (2)
2. Place the kit components within easy reach of your work area.
Important:
Rail kit installation is performed using either Step 3 or Step 4 depending on the type of
rails in use. Read each step carefully and consult your installation environment before
proceeding.
Installing the server
October 2019
Installing the Avaya Converged Platform 130 Series
23