Issue 2 July 2005
39
Chapter 3: Installation
The C360 switch is ready to work after you complete the installation instructions described in
this chapter. After you have completed the procedures in this chapter, proceed to
Chapter 4: Powering Up the Avaya C360
The following steps are described in this chapter:
●
●
●
●
●
●
Making Connections to Network Equipment
●
Installing SFP GBIC Transceivers
Preparing Needed Tools
Prepare the tools you need to mount the Replace variable w/ short product name, according to
the
Table 5: Mounting Tools
If you need to mount on...
Prepare these tools
Rack or wall
Phillips head screwdriver
Flat wall
screws to fasten Replace variable w/ short
product name to the wall
Uneven wall
●
16.3" x 18.3" (415 x 465 mm) plywood
board 0.8" (20 mm) thick
wood screws
●
screws to fasten the Replace variable w/
short product name to the wall
Summary of Contents for C360 Manager
Page 17: ...Issue 2 July 2005 17 Section 1 Avaya C360 Overview...
Page 18: ...18 Installation and Configuration Guide Avaya C360 Multilayer Stackable Switches version 4 5...
Page 29: ...Issue 2 July 2005 29 Section 2 Installing the C360...
Page 30: ...30 Installation and Configuration Guide Avaya C360 Multilayer Stackable Switches version 4 5...
Page 91: ...Issue 2 July 2005 91 Section 3 Avaya C360 Configuration...
Page 92: ...92 Installation and Configuration Guide Avaya C360 Multilayer Stackable Switches version 4 5...
Page 211: ...Issue 2 July 2005 211 Section 4 Troubleshooting and Maintaining the Avaya C360...
Page 212: ...212 Installation and Configuration Guide Avaya C360 Multilayer Stackable Switches version 4 5...