Avaya C360 Overview
24 Installation and Configuration Guide Avaya C360 Multilayer Stackable Switches, version 4.5
traffic and for prioritizing mission-critical traffic in the network. This applies to routed traffic
only.
Monitoring
●
Front panel LEDs that provide at-a-glance port and switch status. Refer to
on page 31 for further information.
●
Port mirroring lets you transparently mirror traffic from one source port to a destination port
to monitor traffic. Refer to
on page 151 for further information.
●
Four groups (history, statistics, alarms, and events) of embedded remote monitoring
(RMON) agents for network monitoring and traffic analysis. Refer to
for further information.
●
Syslog facility for logging system messages about events, errors and other important
information. Refer to
on page 106 for further information.
●
Port classification to regular/valuable so in case of link failure notification is generated for
valuable ports only. Refer to
on page 143 for further information.
●
The C360 supports SMON switch monitoring which provides unprecedented top-down
monitoring of switched network traffic at the following levels:
- Enterprise Monitoring
- Device Monitoring
- VLAN Monitoring
- Port-level Monitoring
This top-down approach gives you rapid troubleshooting and performance trending to keep
the network running optimally. Refer to
on page 149 for further information.
Power over Ethernet (PoE) Support on C360-PWR switches
●
802.3af support for PoE standard based to provide power to IP phones, wireless access
point and other standard based end points. Refer to
information.
●
Autodetection and control of inline phone power on a per-port basis on all 10/100 ports for
plug-and-play configuration. Refer to
How the C360-PWR Switches Detect a Powered
on page 198 for further information.
●
Priority-based power management ensures that key devices, such as IP telephones,
receive power.
●
Up to 15.4W per powered device
Summary of Contents for C360 Manager
Page 17: ...Issue 2 July 2005 17 Section 1 Avaya C360 Overview...
Page 18: ...18 Installation and Configuration Guide Avaya C360 Multilayer Stackable Switches version 4 5...
Page 29: ...Issue 2 July 2005 29 Section 2 Installing the C360...
Page 30: ...30 Installation and Configuration Guide Avaya C360 Multilayer Stackable Switches version 4 5...
Page 91: ...Issue 2 July 2005 91 Section 3 Avaya C360 Configuration...
Page 92: ...92 Installation and Configuration Guide Avaya C360 Multilayer Stackable Switches version 4 5...
Page 211: ...Issue 2 July 2005 211 Section 4 Troubleshooting and Maintaining the Avaya C360...
Page 212: ...212 Installation and Configuration Guide Avaya C360 Multilayer Stackable Switches version 4 5...