background image

23 

3.9.4 Fuel Line Installation. 

Installation  of  the  fuel  line  between  the  fuel  pickup 

and the heater is shown in Fig.24. Sections of the fuel line 
are connected by means of couplings. 

If couplings are not cut off and are delivered as one 

rubber sleeve, it is necessary to cut it into appr. lengths of 
50-70mm. 

Proper connection of two fuel tubes with a coupling is 

shown in Fig. 25. 

 

 

 

Cutting  of  couplings  and  fuel  tubes  should  be 
done only with a sharp knife. Interfaces shall not 
be crushed and must be free of burrs or narrowing 
of the flow cross section. 

 

3.9.5 Heater Fuel Intake with T-Fitting. 

Fuel intake from fuel return line from engine to the fuel 

tank can be carried out using a T-fitting.  The fuel return line 
must be with no pressure with its end at the bottom of the fuel 
tank. Fig. 26 shows installation of the T-fitting. 

 

 

 

Summary of Contents for PLANAR-2D-12/24

Page 1: ...www autoterm ru Air heater Installation Instructions PLANAR 2D 12 24 PLANAR 4DM2 12 24 P PLANAR 44D 12 24 GP P PLANAR 8DM 12 24 P...

Page 2: ...6 Introduction 7 Application modification 7 Safety 8 Installation 9 PLANAR 2D Heater Dimensions 10 PLANAR 4DM2 Heater Dimensions 11 PLANAR 44D Heater Dimensions 12 PLANAR 8DM Heater Dimensions 13 Hea...

Page 3: ...3 Connections Diagram Main Parts and units of PLANAR 2D...

Page 4: ...4 Connections Diagram Main parts and units of PLANAR 4DM2 mod P...

Page 5: ...5 Connections Diagram Main parts and units of PLANAR 44D mod P...

Page 6: ...6 Connections Diagram Main parts and units of PLANAR 8DM mod P...

Page 7: ...tion instructions contain the necessary information and advice on the installation of air heaters PLANAR 1 Application modification Application of air heaters Air heaters are designed to heat the driv...

Page 8: ...shall not be connected to the electric circuit of the vehicle with its engine running and no battery installed Installation of the heater and its component parts shall be carried out by specialized o...

Page 9: ...length of the output duct should not exceed 5 meters in total When mounting the heater care should be taken to ensure that its housing does not have harmful contact with projecting parts of the floor...

Page 10: ...10 PLANAR 2D Heater Dimensions...

Page 11: ...11 PLANAR 4DM2 Heater Dimensions...

Page 12: ...12 PLANAR 44D Heater Dimensions...

Page 13: ...13 PLANAR 8DM Heater Dimensions...

Page 14: ...14 Heater Mounting Position...

Page 15: ...15 Heater Mounting Position...

Page 16: ...16 Heater Mounting holes...

Page 17: ...Fig 13 Installation of air ducts to the air heater PLANAR 8DM is forbidden When using a mounting box outlet should be sealed in such a manner that the box itself did not get hot air 3 5 Combustion Ai...

Page 18: ...operation of vehicle units The outlet of the exhaust pipe should be in such a position that would prevent clogging or entering of snow and also provide for free drain of any water that got into it Fo...

Page 19: ...aust pipe outlet and the air intake shall not be placed on the opposite sides of the vehicle Fig 18 The correct installation of the exhaust and air intake pipes is on one side The distance between the...

Page 20: ...20...

Page 21: ...fuel tank is shown in Fig 19 The fuel tank needs to be mounted so that fuel which can be spilled when filling a fuel tank shouldn t be applied on an exhaust system and an electrical wiring Fuel fille...

Page 22: ...mp is used for metered supply of fuel into the combustion chamber The fuel pump is operated by electrical impulses sent by the control unit The pulse frequency corresponds to the certain performance o...

Page 23: ...r connection of two fuel tubes with a coupling is shown in Fig 25 Cutting of couplings and fuel tubes should be done only with a sharp knife Interfaces shall not be crushed and must be free of burrs o...

Page 24: ...ing operation of the vehicle must be eliminated Harnesses are fastened to elements of the vehicle with plastic clips Attention Mounting shall be carried out with the fuse removed If the length of the...

Page 25: ...fastened to the panel with screws The wire is led out of the Controller housing through the back cover The Controller snaps to the bracket with an audible click 3 9 8 Cab Sensor Installation Cabin se...

Page 26: ...fuel supply line can be filled in two ways 1 to start a heater several times Time of one full start 5 minutes 2 to use the fuel pumping device Control of filling of the fuel supply line is exercised v...

Page 27: ...27 PLANAR 2D Electrical Wiring Diagram...

Page 28: ...28 Electrical Wiring Diagram PLANAR 44D PLANAR 4DM2 mod...

Page 29: ...29 Electrical Wiring Diagram PLANAR 8DM mod...

Reviews: