5 Intelligent Boiler Sequencing
Page | 72
MM Application Possibilities
5
INTELLIGENT BOILER SEQUENCING
The objective of Intelligent Boiler Sequencing (IBS) is to ensure that the minimum number of boiler/
burner units are in operation at any one time to satisfy the heat or steam requirement imposed upon
the boiler plant, in the case of multi-boiler installations.
The benefits from using IBS include an increased savings in electrical costs, a reduction in thermal
stress on the lag boilers, and an increase in overall plant efficiency. It is possible on the MMs to select
steam sequencing, low pressure steam sequencing and hot water sequencing.
There are variations of the IBS software that can be selected via the options/parameters procedure:
hot water boilers, and steam boilers.
A maximum of ten MM, EGA, universal I/O modules may be interconnected by a two wire screened
data cable. Any MM interconnected may be selected as the lead boiler for the sequencing. The lead
boiler is identified by:
1. Connecting a mains voltage onto Terminal 88 (only on the Mk8 MM)
2. Selecting Lead boiler in the IBS screen
3. Instructing the modules via the DTI module (Data Transfer Interface) or by PC CEMS Audit
software.
The sequence order of the MMs in the loop can be changed by changing their ID numbers or by
changing the order on the DTI if shuffle sequencing is enabled through parameter 101.
Sequencing can be used with external load detector and multi-burner operation, but it cannot be used
with external modulation.
Summary of Contents for Mk8 MM
Page 1: ...Combustion Management Systems MM APPLICATION POSSIBILITIES Technical Manual 18 12 2019...
Page 8: ...1 Sensors Page 2 MM Application Possibilities Gas Pressure Sensor...
Page 27: ...1 Sensors Page 21 MM Application Possibilities Air Pressure Sensor...
Page 32: ...1 Sensors Page 26 MM Application Possibilities Steam Pressure Sensor...
Page 36: ...1 Sensors Page 30 MM Application Possibilities Outside Temperature Sensor...
Page 37: ...1 Sensors Page 31 MM Application Possibilities Outside Temperature Module...
Page 38: ...1 Sensors Page 32 MM Application Possibilities Outside Temperature Module Wiring...
Page 42: ...2 Flame Safeguard Page 36 MM Application Possibilities 2 1 1 Interrupted Pilot Gas...
Page 43: ...2 Flame Safeguard Page 37 MM Application Possibilities 2 1 2 Interrupted Pilot Oil...
Page 46: ...2 Flame Safeguard Page 40 MM Application Possibilities IR End View Scanner...
Page 72: ...2 Flame Safeguard Page 66 MM Application Possibilities 2 9 3 Wiring...
Page 81: ...5 Intelligent Boiler Sequencing Page 75 MM Application Possibilities 5 1 3 Hot Water Example...
Page 83: ...5 Intelligent Boiler Sequencing Page 77 MM Application Possibilities 5 1 5 IBS Communications...