7-32
CONNECTION OF SERVICES
Display
Description
Options / Notes
Shows the status of the Tank Heaters (on
The addition of a tank symbol (
€
) in
/ off) (when fitted).
the top centre of the main EC325
Press the select button (
) to switch
display indicates that the tank
between OFF and ON
heater are on
Current (in Amps) being drawn from or
Negative figure (-) = current being
charged into the selected battery.
drawn from the selected battery
If a solar panel is fitted this display will
Positive figure = current being used
include the current being provided by the
to charge the selected battery
solar panel
Allows operation of the External pump for
Will have no effect if the External
a period of one minute
pump is already switched on (see
(for filling the internal tank from the
above)
external tank)
Will not operate if the Internal
Use the select button (
) to START (or
(Fresh) water tank is showing 100%
STOP)
Full
Access to set the internal clock
Please note the clock uses a 24
Press the select button (
) to select
hour cycle
HOUR
Use the up/down (
) buttons to
change
Press the select button (
) to select
MINUTE
Use the up/down (
) buttons to
change
Press the select button (
) to exit
Access to set the alarm clock
Please note the alarm uses a 24
Press the select button (
) to select
hour cycle
hour
Use the up/down (
) buttons to
change
Press the select button (
) to select
MINUTE
Use the up/down (
) buttons to
change
Press the select button (
) to exit
Shows the alarm clock status (on/off)
The addition of a asterisk (*0 in the
Press the select button(
) to switch
top left of the main EC325 display
between OFF or ON
indicates that the alarm is set
Clock Set?
12:00
Alarm Set?
12:00
Water Tank Fill?
(Start 1 Min)
Tank Heaters
ON
5
EC300 Control Panel (continued)
Battery Current
5.4 Amps
Alarm = OFF
Summary of Contents for Broadway FB
Page 2: ...DATA RECORD ...
Page 10: ...2 4 MOTORHOME CODE ...
Page 16: ...5 2 ARRIVAL AT SITE ...
Page 24: ...6 8 SAFETY SECURITY ...
Page 59: ...7 35 CONNECTION OF SERVICES 12V 230V WIRING DIAGRAM ...
Page 60: ...7 36 CONNECTION OF SERVICES ...
Page 93: ...9 29 FITTED EQUIPMENT ARRANGEMENT OF EQUIPMENT BROADWAY EL DUO ...
Page 94: ...9 30 FITTED EQUIPMENT ARRANGEMENT OF EQUIPMENT BROADWAY FB ...
Page 99: ...9 35 FITTED EQUIPMENT NORMAL SEATING ASSEMBLY BROADWAY EL DUO ...
Page 100: ...9 36 FITTED EQUIPMENT SINGLE BED ASSEMBLY BROADWAY EL DUO ...
Page 101: ...9 37 FITTED EQUIPMENT DOUBLE BED ASSEMBLY BROADWAY EL DUO ...
Page 103: ...9 39 FITTED EQUIPMENT NORMAL SEATING ASSEMBLY BROADWAY FB ...
Page 104: ...9 40 FITTED EQUIPMENT DOUBLE BED ASSEMBLY BROADWAY FB ...
Page 108: ......
Page 128: ...12 10 SERVICE DETAILS ...
Page 130: ...13 2 NOTES Designed and Printed by Preset Graphics HB1103 MY 2013 Ref 21301 ...