Mounting Instruction
Chain drive KSA xxx-24 V / 230V
Assembly procedure for
Mounting brackets: A-1 / B-1 / B-2
for inward opening windows / Frame installation on HSK
Route cable on / in casement
- the cable must adapt to the pivoting range of the drive (lay with strap)
- Cable must be protected against damage such as shearing off, kinking,
cracking (e.g. with a cable protection conduit)
Laying in casement profile
with cable transition
RA
FL
without cable transition
RA
FL
Routing of connection cable in lower transition area:
- Ensure that cable doesn't get damaged during opening and closing
(e.g. by kinking, shearing off, squashing). Protect cable routing within profile
e.g. by means of cable sleeves and protect cable transitions.
BD
BD
AK
AK
Install customer-provided junction box and make electrical connection (pages 62 & 63)
- near the window / must be easily accessible later
- mind cable length of drives, standard length approx. 5m
- Ensure that a later removal of the connection cable is possible if necessary
- avoid installation area with big temperature fluctuations- danger of condensation
Cable conduit
surface-mounted
Cable conduit
flush-mounted
Junction box
surface-mounted
Junction box
flush-mounted
AK
max.10m
Check safety of assembled system
and conduct trial run
see page 61