5.3.
Accessories for electrical connection
5.3.1.
Parking frame
5.3.2.
DS intermediate frame for double sealing
5.3.3.
External earth connection
6.
Operation................................................................................................................................
6.1.
Manual operation
6.1.1.
Engage manual operation
6.1.2.
Disengage manual operation.
6.2.
Motor operation
6.2.1.
Local operation
6.2.2.
Actuator operation from remote
7.
Indications..............................................................................................................................
7.1.
Indication lights
7.2.
Mechanical position indicator/running indication on indicator mark on cover
8.
Signals (output signals).........................................................................................................
8.1.
Feedback signals from actuator
8.2.
Signals from local controls
9.
Commissioning......................................................................................................................
9.1.
Switch compartment: open
9.2.
Torque switching: set
9.3.
Limit switching: set
9.3.1.
End position CLOSED (black section): set
9.3.2.
End position OPEN (white section): set
9.4.
Intermediate positions: set
9.4.1.
Running direction CLOSE (black section): set
9.4.2.
Running direction OPEN (white section): set
9.5.
Test run
9.5.1.
Direction of rotation: check
9.5.2.
Limit switching: check
9.6.
Electronic position transmitter EWG 01.1
9.6.1.
Measuring range: set
9.6.2.
Current values: adjust
9.6.3.
LED end position signalling: switch on/off
9.7.
Potentiometer
9.7.1.
Potentiometer setting
9.8.
Electronic position transmitter RWG
9.8.1.
Measuring range: set
9.9.
Mechanical position indicator: set
9.10.
Switch compartment: close
10.
Corrective action....................................................................................................................
10.1.
Faults during operation/commissioning
10.2.
Motor protection (thermal monitoring)
11.
Servicing and maintenance...................................................................................................
11.1.
Preventive measures for servicing and safe operation
11.2.
Maintenance
11.3.
Disposal and recycling
3
SA 07.2 – SA 16.2 / SAR 07.2 – SAR 16.2
SEM 01.1/SEM 02.1
Table of contents