
©2004 AUGIER SA.
I-7
II.2.1.5
Serial Link: ________________________________________________________________ II-40
II.2.1.6
Circuit selector: ____________________________________________________________ II-41
II.3
ADJUSTING THE CCR _____________________________________________________________ II-43
II.3.1
ADAPTATION TO LOAD ________________________________________________________ II-43
II.3.1.1
Maximum power levels by power settings: _______________________________________ II-43
II.3.2
PARAMETER MODIFICATION ___________________________________________________ II-43
II.3.2.1
Preferred configuration values: ________________________________________________ II-43
II.3.2.2
Brightness values: __________________________________________________________ II-44
II.3.2.3
Value of “Open Circuit” protection level: _________________________________________ II-44
II.3.2.4
Value of “Overcurrent” protection levels: _________________________________________ II-44
III
COMMISSIONING _________________________________________________ III-45
III.1
PROCEDURE ___________________________________________________________________ III-45
III.2
TESTS _________________________________________________________________________ III-46
III.2.1
SHORT-CIRCUIT TESTS _______________________________________________________ III-46
III.2.2
OVERLOAD TESTS ___________________________________________________________ III-46
III.2.3
OPEN-CIRCUIT TEST _________________________________________________________ III-46
IV
MAINTENANCE___________________________________________________ IV-47
IV.1
FORMALISATION ________________________________________________________________ IV-47
IV.2
PREVENTIVE ___________________________________________________________________ IV-47
IV.2.1
FIRST MONTHS ______________________________________________________________ IV-47
IV.2.2
ANNUAL PROCEDURE ________________________________________________________ IV-47
IV.2.3
EVERY THREE YEARS ________________________________________________________ IV-47
IV.3
CORRECTIVE ___________________________________________________________________ IV-48
IV.3.1
FAULT DIAGNOSIS ___________________________________________________________ IV-48
IV.3.1.1
LV power fault:____________________________________________________________ IV-48
IV.3.1.2
“Open Circuit” fault: ________________________________________________________ IV-49
IV.3.1.3
“Overcurrent” fault:_________________________________________________________ IV-50
IV.3.2
OTHER FAULTS______________________________________________________________ IV-51
IV.4
VERIFICATION PROCEDURES _____________________________________________________ IV-52
IV.4.1
THYRISTORS________________________________________________________________ IV-52
IV.5
SPARE PARTS LIST FOR FAA TYPE CCR ___________________________________________ IV-52
IV.6
SPARE PARTS LIST FOR IEC TYPE CCR ____________________________________________ IV-55
V
APPENDIX A: DIAGRAMS ____________________________________________ V-56
VI
APPENDIX B: JBUS TABLE_________________________________________ VI-58
VII
APPENDIX C: PART NUMBER IDENTIFICATION ________________________ VII-66