Once all the connections are completed and checked, ensure that the volume control
on your amplifier / preamplifier is at the minimum setting.
Turn on the TT-Three PSU BEFORE turning on the amplification; the amplifier
should be the LAST item to be turned on when you are ready to listen to your
system, and the FIRST item to be turned off when the listening session is over.
Turn on the TT-Three by using the rocker switch located on the rear top right of the
PSU’s back panel, just below the mains inlet socket.
The red front panel light should now be lit.
Speed Selector
Turn the selector to the required playback speed; move the
switch ‘clockwise’ / to the right for 33, and ‘counter-clockwise’ /
to the left for 45.
Start / Stop
As the name suggests, this switch is used to start / stop the
rotation of the TT-Three platter. Turn the knob ‘counter-
clockwise’ / to the left to start the platter turning, and
‘clockwise’ / to the right to stop the platter.
The TT-Three combined with PSU 1 and PSU 2 takes around 1 second to reach
correct speed from start up. With the PSU 3, correct speed is reached after around
four seconds, due to this superior power supply’s use of a combination of first digital,
then analogue signal generation system.
OPERATION
Summary of Contents for TT-Three
Page 1: ...TT Three TURNTABLE OWNER S INFORMATION...
Page 9: ...Remove the sub chassis from the box shown in RED UNPACKING AND INSTALLATION continued...
Page 10: ...Locate and remove the sub platter bearing shown in RED UNPACKING AND INSTALLATION continued...
Page 14: ...Remove the main base motor unit shown in RED UNPACKING AND INSTALLATION continued...
Page 15: ...Remove the base foam slab shown in RED UNPACKING AND INSTALLATION continued...
Page 16: ...Remove the platter and its packing foam slab shown in RED UNPACKING AND INSTALLATION continued...