Place the main base / motor unit on a clean, solid, level surface.
IT IS ESSENTAIL
THAT THIS SURFACE IS LEVEL.
If it is not, the suspension set up will be
compromised and optimal performance will not be achievable.
Locate the three suspension towers (shown in RED):
UNPACKING AND INSTALLATION continued…
Summary of Contents for TT-Three
Page 1: ...TT Three TURNTABLE OWNER S INFORMATION...
Page 9: ...Remove the sub chassis from the box shown in RED UNPACKING AND INSTALLATION continued...
Page 10: ...Locate and remove the sub platter bearing shown in RED UNPACKING AND INSTALLATION continued...
Page 14: ...Remove the main base motor unit shown in RED UNPACKING AND INSTALLATION continued...
Page 15: ...Remove the base foam slab shown in RED UNPACKING AND INSTALLATION continued...
Page 16: ...Remove the platter and its packing foam slab shown in RED UNPACKING AND INSTALLATION continued...