26
VERSION 1
VERSION 2
VERSION DP75
VERSION DP95
Installation and exchange of the heatproof shaped piece ( version 1)
The back part of the ash pan pos. 1 insert into the lower chamber and push to stop to the back
plate. Insert the front part of the ash pan pos. 2 and push to stop to the back part of the ash pan. Put
the super-structure of the ash pan pos. 3 on the ash pan and push it to stop to the rear. The ash pan
should be situated in the centre lime of the boiler at the front sight.When exchanging damaged
jet pos. 4 or cube pos. 5 , follow the next instructions: Take out the jet and the cube / the cube in
DP35 and DP 45 only/ after the elimination of the gaskets. Then insert the new jet eventually the
cube and seal up with gasket backwardss. If it is necessary, change also the gaskets. The jet is
inserted regarding the sign on the lower part of the jet into the rear part of the boiler.
Installation and exchange of the fireproof concrete shaped peaces (version 2)
Put the rear part
pos.1
into the lower chamber, the intagliated part backwards. It is necessary to
put it in horizontal possition and then turn it. Place it to the centre of the chamber and push it to
stop to the rear steel plate. Insert the left front part pos.2 to lower chamber, it is necessary to insert
this part horizontally and then turn it. Use the same method for the right front part of the ash pan
pos. 3. Push both the parts together to stop and then pull them to the rear part of the ash pan.
Summary of Contents for DP PROFI
Page 1: ...W W W A T T A C K S K WOOD GASIFYING BOILER ATTACK DP STANDARD PROFI INSTRUCTIONS FOR USE ...
Page 2: ......
Page 32: ...31 ...
Page 35: ...34 ATTACK DP STANDARD 95 ...
Page 37: ...36 ATTACK DP PROFI 95 ...
Page 39: ......