24
Chimney
Attachment of the appliance to the flue must be always done with approval of authorized chimney-
sweeping company. There must always be sufficient draft in the flue and flue gas must be draught to the
atmosphere in all possible operation conditions. For the right operation of the boiler the independent flue
must be dimensioned in the right way,
because combustion, output and service life of boiler depends
on the draught.
The draught is influenced by the section of flue, height and roughness of the internal
wall. Into the flue where the boiler is attached, no other appliance can be attached.
The flue diameter
must not be smaller than the outlet on the boiler.
Flue draught must have the specified values. But it
must not be too high so as not to decrease the efficiency of boiler and interrupt burning. If the draught is
too strong, install a throttle valve between the flue and boiler.
Informative values of flue section:
For DP25, DP35, DP45 DP75, DP95
20x20 cm min. height
7 m Ø25 cm min.
height 9 m
Ø20 cm min.
height
8 m Ø30 cm min.
height 7 m
15x15 cm min. height 11 m 25x25 cm min. height 8 m
Ø16 cm min.
height 12 m
Flue draught is specified in technical parameters.
Exhaust pipe
Exhaust pipe must have the outlet into the chimney. If the boiler can not be attached to the chimney
directly, the exhaust pipe must be
as short as possible and not longer than 1m
without heating surface
and it must rise to the flue. Exhaust pipes must be tight and resistant against flue gas leakage and cleanable
from inside. Exhaust pipes must not come through home and utility spaces and the internal section of the
exhaust pipe must not be narrowing to the flue. Using bents is not suitable.
Connecting the boiler to the mains net
The boiler is connected to the mains of 230 V, 50 Hz by a supply cord and plug. The voltage is of M type
and when replaced, the same type must be used by a service oragnization.The appliance must be located
in such a way that the plug was within the reach of the attendance.
(according to STN EN 60 335-1 + A11:1997).
Installation of the boiler to the heating system
The ATTACK DP boiler only by a company certified for the installation and assembly of heating
equipment. Before the installation there must be a project responding to valid regulations. Before
installing the boiler to the old heating system, the installing company must sluice out the whole system to
clean it. The heating system must be filled by the water of quality according to STN 07 7401:1991,
2+
especially the hardness of water cannot be more than 1 mmol/l and the ia Ca cannot be more that 0,3
mmol/l. If these conditions are not kept, the warranty cannot be accepted.
Boiler transport
Producer enables better manipulation with the boiler by the eyes welded on
the exchanger. They ensure better clamping of chain or rope that can be used to
place the boiler as it is required. Before beginning of transport, put down the
upper covers. Place the boiler by using of eyes and rope to the required
location and put the upper covers back. To ensure safe manipulation with the
boiler, it is necessary to leave appropriate space. For manipulation, use only
devices that are technically in conformity with technical norms and control
them in adequate way, not to threaten safety of the people. Special machineries
have to be attended by trained staff. Producer takes no responsibility for
damages caused by incorrect manipulation and by breaking instructions given
in this manual. Producer also takes no responsibility for bodily injuries caused
by breaking safety instructions.
Summary of Contents for DP PROFI
Page 1: ...W W W A T T A C K S K WOOD GASIFYING BOILER ATTACK DP STANDARD PROFI INSTRUCTIONS FOR USE ...
Page 2: ......
Page 32: ...31 ...
Page 35: ...34 ATTACK DP STANDARD 95 ...
Page 37: ...36 ATTACK DP PROFI 95 ...
Page 39: ......