7. Test Descriptions
Dual Display Indicator
Test Description :
Verify that the Dual Display indicator is working.
Test Sequence :
1. Monitor is powered up in the quiescent state.
2. RED1 and GRN1 are on.
Monitor Response to PASS
:
Dual Display Indicator must be illuminated. The user must verify by clicking yes in the pop-up window.
Redfail Indicator
Test Description :
Verify that the Redfail indicator is working.
Test Sequence :
1. Monitor is powered up in the quiescent state.
2. Redenable input is active.
3. All RED channels are at AC line.
4. RED1 is turned off.
Monitor Response to PASS
:
Redfail Indicator must be illuminated. The user must verify by clicking yes in the pop-up window.
Short YEL Indicator
Test Description :
Verify that the Short Yellow indicator is working.
Test Sequence :
1. Monitor is powered up in the quiescent state.
2. All RED channels are at 120Vac.
3. RED1 is turned off.
4. GRN1 is turned on.
5. Delay 2 sec.
6. GRN1 is turned off.
7. YEL1 is turned on.
8. Delay 2 sec.
9. YEL1 is turned off.
10. RED1 is turned on.
Monitor Response to PASS
:
Short Yellow (clearance) Indicator must be illuminated. The user must verify by clicking yes in the pop-up window.
DC1 (24V1) Fail Indicator
Test Description :
Verify that the DC1 Fail indicator is working.
Test Sequence :
1. Monitor is powered up in the quiescent state.
2. DC1 voltage is removed.
Monitor Response to PASS
:
DC1 (24V) Fail Indicator must be illuminated. The user must verify by clicking yes in the pop-up window.
Watchdog Fail Indicator