7. Test Descriptions
2. Redenable input is active.
3. All RED channels are at 120Vac.
4. Turn on YEL1.
5. Check for fault.
6. Turn off YEL1.
7. Reset monitor.
8. Repeat 4 through 7 for all channels.
Monitor Response to PASS
:
Monitor must be found in fault state for every channel.
LGND/EGND Isolation
Test Description :
Verify that LGND and EGND are NOT shorted together inside of the monitor.
Test Sequence :
No inputs are provided to the monitor. The PCMT tests for a short circuit between the monitor Logic ground and Earth
ground pins.
Monitor Response to PASS
:
Logic ground and Earth ground must not be shorted together in the monitor.
Power and RED Channel Indicators
Test Description :
Verify that the Power and RED channel indicators are working.
Test Sequence :
1. Monitor is powered up in the quiescent state.
2. All RED channels are on.
Monitor Response to PASS
:
Power and RED channel indicators must be illuminated. The user must verify by clicking yes in the pop-up window.
Power, Conflict and GRN Channel Indicators
Test Description :
Verify that the Power, Conflict, and GRN channel indicators are working.
Test Sequence :
1. Monitor is powered up in the quiescent state.
2. All GRN channels are on.
Monitor Response to PASS
:
Power, Conflict and GRN channel indicators must be illuminated. The user must verify by clicking yes in the pop-up
window.
Power, Conflict and YEL Channel Indicators
Test Description :
Verify that the Power, Conflict, and YEL channel indicators are working.
Test Sequence :
1. Monitor is powered up in the quiescent state.
2. All YEL channels are on.
Monitor Response to PASS
:
Power, Conflict and YEL channel indicators must be illuminated. The user must verify by clicking yes in the pop-up
window.
PCMT-8000 User's Manual
Rev. 1.7