![ATS Axsis SC-300H Operation And Reference Manual Download Page 57](http://html1.mh-extra.com/html/ats/axsis-sc-300h/axsis-sc-300h_operation-and-reference-manual_3005243057.webp)
Operations and Reference Manual
Axsis™ SC-300H Digital Radar Speed Camera
2011 American Traffic Solutions, Inc.
Page 55
Proprietary and Confidential
All Materials are subject to change without notice.
6/30/2011
15.6
SC-300H
S
PEED
C
AMERA
S
YSTEM
–
O
PERATIONAL
S
CREEN
Once the previous step s are compl ete, the syst em will do a “Radar Calibration Test ” and then
the following operational screens will be presented.
Current Settings
Violation Statistics
Event History
Pause Button
End Deployment Button
SC-300H Speed Camera System – Operational Screen
Note: The operational screen also displays the current operational status in the bottom
left corner. The above example shows that the deployment is initializing. At this point the
system will reach out to the camera and take test shots and fire the strobe. Once the
initial startup diagnostics have been performed and have passed, including a “Self Test”,
the radar will be “Armed” and operational.