MACHINE INSTALLATION OVERVIEW
This section should only be carried out by
qualified technical service personnel
.
Review the list below and perform as needed.
Explanations are located on the following pages and
in additional manuals.
Inspect machines for transport damage. Any
transport damage should be noted and witnessed
by the freight forwarder. The manufacturer accepts
no responsibility for transport damage.
Check machines for the correct hardware and
software configuration and check EPROMs for
proper fitting.
Replace shipping locks with casino specific locks.
Install and connect accounting system.
Check that all internal and external connections
are seated correctly.
Prepare coin acceptor and hopper.
Thread the power cable out of the machine. Do
not
yet connect power to the machine.
Apply power to the machine.
Load paper into the printer (optional).
Execute basic machine setup (Initial Setup).
Configure game.
Test bill and coin handling.
M
ACHINE
I
NSTALLATION
Note
:
Depending on machine
configuration and jurisdictional
requirements, additional tasks
may have to be carried out
before the machine can be put
into operation (e.g. acceptance
inspection, logicbox sealing,
etc.).
Summary of Contents for Harmony Slant Top
Page 1: ...www atronic com Atronic Harmony Slant Top Installation Manual Rev 1 4 June 2008 ...
Page 6: ...6 June 2008 Harmony Installation Manual blank page ...
Page 9: ...9 June 2008 Harmony Installation Manual blank page ...
Page 15: ...15 June 2008 Harmony Installation Manual blank page ...
Page 20: ...20 June 2008 Harmony Installation Manual blank page ...