Installation
29
12AWFSL
Floor
fi
xing is the same both in on-
fl
oor and in-ground installations. The new
concrete must be adequately cured by at least 21 days minimum.
7.4 Lift
Positioning
Unauthorized persons are not allowed to enter during assembly.
• Transport each platform lifting system to the location or the recessed pit
using hoisting device with a load capacity of
1.6 tons
at least. To prevent
the platform from dropping during transport, it should be lifted according
to its center of gravity.
• Place the control unit in the position provided for (the control unit can be
place in either right side or left side).
Figure 15 – Foundation Pit Plan (Only For Flush Mounted, With The Jack Beam)
Summary of Contents for 12AWFSL
Page 1: ...Replace This With Cover PDF ...
Page 16: ...Technical Specification 16 12AWFSL Figure 3A Layout For In Ground Installation ...
Page 17: ...Technical Specification 17 12AWFSL Figure 3B Layout For On Ground Installation ...
Page 21: ...Technical Specification 21 12AWFSL Figure 6 Electrical Plan 220V 1Ph ...