Packing, Transport, Storage
10
12AWFSL
Packing, Transport, Storage
3.1 Packing
The packing of the lift is delivered in following components:
• No. 2 base units, each one with a runway equipped with 2 hydraulic cylinders
• No. 1 jack beam with an air pedal pump
• No. 1 control unit and containing hydraulic unit, hydraulic hoses, air hoses,
anchor bolts, rubber blocks and the technical
fi
les.
• No. 2 turntable recess covers
• No. 2 drive-on ramps, 2 drive-off ramps, and 4 hose protective covers if
the lift is ordered for on-
fl
oor installation
(If requested, optional accessories are available to satisfy each customer’s
requirements).
3.2 Lifting
And
Handling
When loading/unloading or transporting the equipment to the site, be sure to
use suitable loading (e.g. cranes, trucks) and hoisting means. Be sure also to
hoist and transport the components securely so that they cannot drop, taking
into consideration the package’s size, weight and center of gravity and it’s fragile
parts.
In Figure 1 there are the correct indications for the lifting of the runways:
Hoist and handle only one package at a time.
Summary of Contents for 12AWFSL
Page 1: ...Replace This With Cover PDF ...
Page 16: ...Technical Specification 16 12AWFSL Figure 3A Layout For In Ground Installation ...
Page 17: ...Technical Specification 17 12AWFSL Figure 3B Layout For On Ground Installation ...
Page 21: ...Technical Specification 21 12AWFSL Figure 6 Electrical Plan 220V 1Ph ...