G. Position Columns
1. Position the columns so the base plates line up with the chalk line. It is
recommended to install the power side column on the passenger side of the
vehicle. Meanwhile, assemble the overhead top beam (See fi g. 20, 21).
Spread the columns to approximately 122-5/8” from inside column to inside
column. Install the overhead top beam.
2. Level and plumb the columns and shim where necessary.
3. Drill 3/4” holes. If the top of the anchor exceeds 2 inches above the floor
grade, you DO NOT have enough embedment.
Width between
columns: 123 1/2”
Adjust with
the shims
37/101
36
Overall width: 150 3/4”
Fig. 20
Bolting
Cleaning
Drilling
Summary of Contents for PV-15PX
Page 32: ...PV 15PX Exploded View 33 PV 15PX PV 15PX Exploded View Fig 40 ...
Page 33: ...PV 15PX Exploded View 34 PV 15PX Cylinders Fig 41 ...
Page 34: ...PV 15PX Exploded View 35 PV 15PX ATLAS Manual power unit Fig 42 220V 60HZ Single Phase Fig 42 ...
Page 35: ...PV 15PX Exploded View 36 PV 15PX Illustration Of Hydraulic Valve Fig 43 ...