background image

9

MAINTENANCE

The water purifier is designed to operate with a minimal amount of maintenance, providing the water quality does not exceed 

maximum concentration levels, see 

“Water Quality”

 in the 

“Product Application”

 section on 

Page 4

.

Ordinary maintenance consists of;

• 

Lamp replacement is recommended every 10,000 hours of operation, approximately 12 months of continuous service.

• 

Cleaning of the quartz sleeve, when conditions warrant. It is recommended that the inspection of quartz sleeve be performed 

after one month of use. If quartz sleeve is found to be coated (not clear), then frequency of cleaning must be done more often. 

Deposits or discoloration on the surface of quartz sleeve are caused by excessive levels of the subject contaminant within 

the water that is in contact with the quartz sleeve. Most deposits on the quartz sleeve are caused by an excess of calcium 

(hardness), iron or manganese. Table 1 on Page 4 lists the maximum recommended concentration of these minerals in the 

water that passes through the ultraviolet purifier. If you encounter difficulty due to deposits on the quartz sleeve, your dealer 

will be able to recommend suitable pretreatment to reduce or eliminate the offending contaminant. If quartz sleeve is clean 

(clear) then frequency of cleaning may be extended.

 

• 

Always disconnect the water supply and completely drain the water purifier if it will be subjected to temperatures 

 

below freezing.

• 

Contact factory with questions.

Inspection

1. 

Regularly inspect the water purifier to ensure that the germicidal lamp is still in operation.

• 

An LED indicator light, located on the ballast, provides visual indication of germicidal lamp operation. This provides an 

indication of lamp operation and does not indicate the level of ultraviolet intensity or transmission through the water.

• 

Ballasts have a built-in audio alarm which will indicate lamp failure.

• 

On purifiers so equipped, the 

SENTRY

 Safety Sensor provides visual indication of ballast and ultraviolet lamp 

operation

2. 

To ensure proper operation of the water purifier, regular biological testing of the purifier output water should be performed 

on a schedule recommended by local public health authorities, or at minimum; at installation, quarterly for the first year of 

service and annually, at lamp replacement, for the life of the water purifier.

3. 

Additional testing should be performed whenever modifications, change or additions are made to plumbing system, pumps, 

well source water etc. to ensure adequate disinfection under new condition. 

4. 

As with any water purifier installation, routine maintenance is necessary to ensure your equipment is operating correctly. 

Regular inspection must also include the inspection of the ground to ensure grounding wires are secure to both the water 

purifier and grounding point as originally installed. Regular inspection must also include confirmation that approved ground 

fault circuit interrupt (GFCI) receptacle is still operational and that water purifier is plugged into this GFCI. Any components 

which are damaged, or broken should be replaced.

Summary of Contents for Bio-Logic BIO 1.5

Page 1: ...Manufacturers Engineers Sales Service Germicidal Ultraviolet Equipment Lamps 375 Marcus Boulevard Hauppauge NY 11788 631 273 0500 Fax 631 273 0771 Email Sales AtlanticUV com Shop Products at AtlanticU...

Page 2: ...Patent Notice 16 WARRANTY PRODUCT REGISTRATION 16 These instructions generally describe the installation operation and maintenance of the Bio Logic Ultraviolet Water Purifiers Models BIO 1 5 and BIO...

Page 3: ...TLY hazardous situation which if not avoided WILL result in death or serious injury To guard against injury basic safety precautions should be observed including the following 1 Read and follow ALL sa...

Page 4: ...ual indication of germicidal lamp operation Water leaving the purifier is instantly ready for use no further contact time is required Limitation of Use The water purifier is intended for the use with...

Page 5: ...er should always be located closest to the point of use This reduces the chance of the purified water being re contaminated by bacteria in the water distribution system after the water purifier 6 As w...

Page 6: ...6 Recommended Installation Figure 2 Recommended Installation...

Page 7: ...ter be installed in line prior to the water purifier The sediment filter will stop or trap any particulates from entering the water purifier Particulates may cause damage to the quartz sleeve as well...

Page 8: ...sensor is capable of operating an optional audio alarm and or solenoid valve 13 Promate Audio Alarm Activated by the Ultraviolet Monitor or Safety Sensor alerts the user to any malfunction detected 1...

Page 9: ...actory with questions Inspection 1 Regularly inspect the water purifier to ensure that the germicidal lamp is still in operation An LED indicator light located on the ballast provides visual indicatio...

Page 10: ...mber While holding lamp end remove lamp socket from exposed lamp end 4 Carefully withdraw lamp from chamber Be sure to withdraw lamp straight out without angling until completely clear of quartz sleev...

Page 11: ...hin the static gland nut If so remove Teflon washer from static gland nut before proceeding 6 Carefully remove quartz sleeve from chamber NOTE It is advisable to support the quartz sleeve on the oppos...

Page 12: ...o remove all quartz fragments from the interior of the chamber 8 Carefully discard all pieces of the broken quartz sleeve 9 Align the end of the quartz sleeve with the gland fitting of the chamber 10...

Page 13: ...he Maintenance section Low input voltage Verify input voltage to purifier Change in water quality Have water tested to confirm that it does not exceed maximum recommended concentration levels for use...

Page 14: ...special input power requirements Table 5 Optional Accessories Optional Accessories Available for SENTRY Safety Sensor BIO 1 5 BIO 3 0 Promate Time Delay Mechanism BIO 1 5 BIO 3 0 Promate Elapsed Time...

Page 15: ...5 1366 R 05 1370 R 4 Static Gland Nut 2 25 1492D 25 1492D 5 Teflon Washer 2 25 3023A 25 3023A 6 Rubber O Ring Quartz Sleeve 2 00 1023A 00 1023A 7 CRYSTAL CLEAR Quartz Sleeve 1 15 1700A 15 1701A 8 Cham...

Page 16: ...bility and fitness for a particular purpose whether or not purposes or specifications are described herein We further disclaim any responsibility whatsoever to the customer or to any person for injury...

Reviews: