
CONTROL METHODS
HeatNet Control V3 3.x
Page 29
Figure 19
Base loading relay
Base Load RIB Relay
24 VAC
24 VAC Return, or
Chassis Ground
Enable Input on
Base Load Boiler
1. First ensure that the SETTINGS: BOILER
TYPE:OPTION: is set to BASE LOAD. The
Base Load Relay (K8) will not be enabled/used
unless this is selected.
2. Now, The SETTINGS: BASE LOADING:
BOILERS: must be set to 1.
3. When the START condition in the BASE
LOADING menu is met, the K8 relay will close.
But, only when the DELAY RELEASE TIME
under the BASE LOADING menu expires.
Base Load Relay