® Copyright ATH-Heinl GmbH & Co. KG, All rights reserved / Misprints and technical changes reserved / As of: 2020-10
Manufacturer ATH-Heinl GmbH & CO.KG
- 29 -
2.9.1. Securing the machine
It is recommended that the machine is secured to the floor at the four points provided using M8 anchor
screws and the corresponding dowels.
Drill holes, observing
the necessary drill depth
A and drill diameter of
the dowel manufacturer
Clean out the inside of
the holes
Insert the anchor bolts
into the holes until they
have reached an
appropriate depth.
Tighten the nuts to the
torque specified by the
manufacturer
Clamping thickness B
varies depending on the
floor covering
2.10
Completion of Work
Before commissioning, check all fastening screws, electrical, pneumatic and hydraulic
lines and, if necessary, tighten these. Warning: in some cases, this must be checked at
regular intervals and tightened if necessary (note in the instructions).
Summary of Contents for 80424200937
Page 3: ...BEDIENUNGSANLEITUNG ATH M72Z Plus ...
Page 59: ...OPERATING INSTRUCTIONS ATH M72Z Plus ...
Page 115: ...MANUEL D UTILISATION ATH M72Z Plus ...
Page 171: ...NÁVOD K OBSLUZE ATH M72Z Plus ...
Page 227: ...MANUAL DE INSTRUCCIONES ATH M72Z Plus ...
Page 283: ...BEDIENINGSHANDLEIDING ATH M72Z Plus ...
Page 339: ...INSTRUKCJA OBŁSUGI ATH M72Z Plus ...
Page 395: ...NÁVOD NA OBSLUHU ATH M72Z Plus ...