ATB AQUAmax BASIC Installation Instructions Manual Download Page 9

Installation instructions AQUAmax

®

 BASIC/CLASSIC 1-75 

 

ATB WATER GmbH, Südstraße 2, D-32457 Porta Westfalica, www.atbwater.com / 
Art.-No.: 9060 0209 / Status: 17.01.2019 / Page 9 from 24 

 

Services to be Provided by the Customer

 

 

  The tanks are to be offset to the appropriate height and are to be watertight  

 

  A watertightness test  has been carried out and completed successfully. For this the installation 

instructions of the tank manufacturer are to be complied with.  

 

  All chambers of the plant are to be accessible for people (clear openings at least 60 cm 

diameter).  

 

  The cover of the tank with the aeration chamber must have ventilation openings. In addition a 

ventilation facility at the outlet pipe plant is strongly recommended. The correct ventilation via 
the roof is to be ensured.  

 

  The outlet pipeline is connected to the manhole and protrudes ca. 15 cm into the manhole (do 

not cut off at the manhole wall!).  

 

  Behind the wastewater treatment plant there is a further distribution, monitoring or percolating 

manhole. If this is not the case then a sampling possibility is to be installed in the SBR tank.  

 

  A 230 V energy supply is to be laid and fused separately as follows: B 16 A, and residual 

current circuit breaker 25 A / 30 mA.  

 

  A cable pipe is to be laid between the control unit and the wastewater treatment plant. The 

diameter should be at least 10 cm. No bends with a greater curvature angle than 30° are to be 
laid. The cable pipe is to be sealed against odours.  

 

  A draw wire is planned in the empty pipe. The maximum distance between control unit and 

AQUA

max

®

 for plug-in variants is 35 m, for plants with compressed aeration (ZB) 12 m. 

 

  The tank is free of wastewater and cleaned.  

 

 The AQUA

max

®

 incl. accessories are on the construction site at the start of assembly.  

 

  The partition wall between aeration stage and sludge storage is to be produced watertight and 

provided with an emergency overflow (ca. 10 x 4 cm) in the upper area (single tank plant).  

 

  The maximum difference between lower edge runoff and upper edge partition wall is 30 cm 

(AQUA

max

®

  BASIC and M configurations). 

 

  The inlet pipeline is connected to the primary settling stage. With retrofitting this, as a rule, has 

been relaid (Note drawing "Tank preparation" or project sketch). 

 
 

Summary of Contents for AQUAmax BASIC

Page 1: ...Innovations for clean water AQUAmax BASIC CLASSIC Installation Instructions...

Page 2: ......

Page 3: ...14 Installing of the AQUAmax Page 16 AQUAmax with compressed aeration ZB Page 18 Sampling bottle Sampling bypass Page 19 The ATBcontrol 3 control equipment Page 21 Cable connection test run Page 22 P...

Page 4: ...e complied with All tasks may be carried out by trained and qualified specialists with appropriate certificate of technical qualification The operator is to be instructed by the fitter With the connec...

Page 5: ...ra e 2 D 32457 Porta Westfalica www atbwater com Art No 9060 0209 Status 17 01 2019 Page 5 from 24 Explanation of the warning notices used Attention Danger due to electrical voltage Rotating parts Dan...

Page 6: ...A for suspension on chains 2 submers aerator AQUA 5 1 submersible pump ATBlift 2 as clarified water pump 1 submersible pump ATBlift 2 as excess sludge and charging pump 1 float switch 15 m connecting...

Page 7: ...e 1 control unit ATBcontrol 3 230 V panel mounting 1 sampling bottle made of PE with bracket 3 5 m PVC hose 25 mm for cleared water 5 0 m PVC hose 30 mm with screw connection for charging 18 m hose 16...

Page 8: ...PE with bracket 5 m PVC hose 25 mm for cleared water 5 0 m PVC hose 40 mm with screw connection for charging 18 m hose 16 mm f r aeration 25 m hose 25 mm f r aeration 3 membrane tube diffuser 1070 mm...

Page 9: ...is is not the case then a sampling possibility is to be installed in the SBR tank A 230 V energy supply is to be laid and fused separately as follows B 16 A and residual current circuit breaker 25 A 3...

Page 10: ...e lower edge of the inlet Close openings in the partition wall If necessary reseal tank joints Introduce empty pipe DN 100 for cable at any desired position Inlet and outlet must project ca 15 cm into...

Page 11: ...of the AQUAmax produces the connection to the last chamber of the primary settling stage Here the thick matter is separated from the influent Coarse interceptor and sludge store SBR aeration Inlet Out...

Page 12: ...nt Float Switch HW min all Types The switch off point of the float switch for all types is at the height of the centre selvedge between upper and lower part of the aerator housing The difference HW mi...

Page 13: ...the plastic bodywork If required loosen the securing screw and relocate the mounting bracket AQUAmax CLASSIC Z ZB Secure the stainless steel hooks supplied in such a way on the tank cover that the AQU...

Page 14: ...rimary settling chamber not the inlet chamber With single chamber primary settling an additional protective pipe or a scum board is to be provided for the immersion pipe Connect the outlet hose with t...

Page 15: ...Installation instructions AQUAmax BASIC CLASSIC 1 75 ATB WATER GmbH S dstra e 2 D 32457 Porta Westfalica www atbwater com Art No 9060 0209 Status 17 01 2019 Page 15 from 24...

Page 16: ...rovided This is also connected to the air distributor Multi and through the empty pipe in the tank with a 25 mm fabric hose From here the air is routed to the membrane diffusers via a 16 mm fabric hos...

Page 17: ...Amax BASIC CLASSIC 1 75 ATB WATER GmbH S dstra e 2 D 32457 Porta Westfalica www atbwater com Art No 9060 0209 Status 17 01 2019 Page 17 from 24 AQUAmax CLASSIC 1 16 ZB quarter chamber AQUAmax CLASSIC...

Page 18: ...outlet so far that the clear water cannot flow back Secure the hose with a pipe clamp to prevent it from slipping out If a non return flap is installed in the clear water hose or if the sampling bottl...

Page 19: ...alfunction of or defects in the plant In this case any liability is ruled out Modifications to the unit are not permitted and lead to the loss of all claims under warranty Do not operate any unit whic...

Page 20: ...as the sockets for the control unit and mains cable and the compressor s AQUAmax ZB mounting plate for one compressor 1 32 PE AQUAmax ZB mounting plate for two compressors 32 PE All tasks which nevert...

Page 21: ...ntrol unit takes place via three short stroke keys By pressing a key the display illumination is switched on lapses if no key is operated within 5 minutes Key functions Scroll upwards or downwards men...

Page 22: ...m the immersion pipe i e bubble free water exits whether the information plate which contains the disposal information is clearly visible and correctly mounted whether the outlet hose is correctly sec...

Page 23: ......

Page 24: ...Installation instructions AQUAmax BASIC CLASSIC 1 75 Art No 9060 0209 Status 17 01 2019...

Reviews: