
Installation instructions AQUAmax
®
BASIC/CLASSIC 1-75
ATB WATER GmbH, Südstraße 2, D-32457 Porta Westfalica, www.atbwater.com /
Art.-No.: 9060 0209 / Status: 17.01.2019 / Page 18 from 24
Sampling bottle
Up to 16 PE and over 51 PE red connection cover, 17-50 PE blue connection cover!
The sampling bottle is attached to the cone of the sewage treatment plant with a holder. The holder
should be provided where is no obstacle when removing the AQUAmax®.
Cut the outlet hose to length and place it on the inlet nozzle of the sampling bottle (note the
marking/flow direction!).
Put the remaining hose on the outlet spout and push it into the outlet so far that the clear water
cannot flow back. Secure the hose with a pipe clamp to prevent it from slipping out. If a non-return
flap is installed in the clear water hose or if the sampling bottle is mounted significantly higher than
the outlet, further action may be necessary. In these cases, please contact our service department.
Sufficient space must be ensured for removing the bottle.
Sampling-Bypass
For variants over 50 PE, a sampling bypass is included in the scope of delivery.
The sampling bottle represents a bottleneck which, in the case of larger systems, means that the
clear water discharge takes up an increasingly unfavourable amount of time. This is prevented by
the bypass, because a part of the clear water flow is routed around the sampling bottle.
Observe flow
direction!
From
AQUAmax
®
Outlet
Bypass