INTRODUCTION
INTRODUCTION
This manual provides procedures and information for installing, and testing the
AT&T System 25 Release 3 and associated equipment. The maintenance
information contained in Section 4 pertains to the AT&T System 25 Release 1,
Versions 1 and 2 (RI VI and R1V2), Release 2, Version 1 (R2V1 ), as well as to
AT&T System 25 Release 3, Version 1,2 and 3 (R3V1, R3V2 and R3V3).
Installation and maintenance procedures for the AT&T System 25 Call
Management System and Integrated Solution are provided in a separate set of
documents for each system.
This manual is intended for use by an installation and/or maintenance technician
dispatched to a System 25 site for an installation or in response to an alarm or a
user trouble report. This technician must have completed the Tier 1 training
course (T-335). Each installed System 25 has a customer-designated System
Administrator. The technician
should work closely with this System
Administrator. The System 25 Administration (555-540-500) and Implementation
(555-540-650) Manuals describe the administrator’s functions.
In the S25 documentation, the terms “voice terminal”, “voice stations”, and
“telephone” are used to describe the same piece of hardware. The S25
documentation also uses the terms ‘Personal Dial Code (PD.)”, and ‘extension
number’ interchangeably.
The remainder of this manual is divided into Sections 2 through 6 and six
appendices:
●
Section 2. Installation-Describes the installation of the cabinet(s)
wiring, and other components. Certain preinstallation requirements
must be met; therefore, read “PREINSTALLATION REQUIREMENTS”
before installing any part of System 25.
●
Section 3. System Test—Describes all the tests necessary to verify
that the system is operating correctly.
●
Section 4. Maintenance —
Provides information necessary for
monitoring, testing, and maintaining all releases of AT&T System 25.
November 1995
1-1
Summary of Contents for Network Adapter 25
Page 1: ...AT T AT T System 25 Installation and Maintenance Manual 555 540 103 B November 1995 ...
Page 18: ...APPENDIX F Administration Error Messages GLOSSARY I N D E X F 1 G 1 I 1 viii ...
Page 31: ...INSTALLATION MOUNTING CENTERS WHEN FLANGES ARE OVERLAPPED Figure 2 2 617A Panel 2 7 ...
Page 33: ...INSTALLATION Z21OA1 ADAPTER Y ADAPTER WP90851 L1 858A ADAPTER Figure 2 3 SIP Adapters 2 9 ...
Page 50: ...INSTALLATION Figure 2 10 Three Cabinet System Front View With Covers Removed 2 26 ...
Page 51: ...INSTALLATION Figure 2 11 Position of Shorting Plugs on CPU Memory Circuit Pack 2 27 ...
Page 72: ...INSTALLATION UPPER ADAPTER MOUNTING CLIP Figure 2 18 Mounting Adapters ...
Page 85: ...INSTALLATION 2 61 ...
Page 92: ...INSTALLATION 2 68 ...
Page 103: ...INSTALLATION Figure 2 32 10B Emergency Transfer Unit 2 78 ...
Page 104: ...INSTALLATION Figure 2 33 Emergency Transfer Unit Connections 2 79 ...
Page 109: ...INSTALLATION Figure 2 35 Attendant Console With DXS Console 2 84 ...
Page 146: ...INSTALLATION 2 119b This page intentionally left blank November 1995 ...
Page 153: ...INSTALLATION This page intentionally left blank 2 124b November 1995 ...
Page 223: ...MAINTENANCE Figure 4 2 Clearing Supply Troubles Sheet 1 of 2 4 47 ...
Page 224: ...MAINTENANCE Figure 4 2 Clearing Power Supply Troubles Sheet 2 of 2 ...
Page 225: ...MAINTENANCE Figure 4 3 Clearing CO Trunk Troubles 4 49 ...
Page 226: ...MAINTENANCE Figure 4 4 Clearing 4 Wire Tie Trunk Troubles Sheet 1 of 4 4 50 ...
Page 227: ...MAINTENANCE Figure 4 4 Clearing 4 Wire Tie Trunk Troubles Sheet 2 of 4 4 51 ...
Page 228: ...MAINTENANCE Figure 4 4 Clearing 4 Wire Tie Trunk Troubles Sheet 3 of 4 4 52 ...
Page 229: ...MAINTENANCE Figure 4 4 Clearing 4 Wire Tie Trunk Troubles Sheet 4 of 4 4 53 ...
Page 231: ...Figure 4 6 Clearing Tie Trunk Troubles Sheet 1 of 5 4 55 ...
Page 232: ...MAINTENANCE 6 7 8 9 10 Figure 4 6 Clearing Tie Trunk Troubles Sheet 2 of 5 4 56 ...
Page 233: ...MAINTENANCE Figure 4 6 Clearing Tie Trunk Troubles Sheet 3 of 5 4 57 ...
Page 234: ...MAINTENANCE Figure 4 6 Clearing Tie Trunk Troubles Sheet 4 of 5 4 58 ...
Page 235: ...MAINTENANCE Figure 4 6 Clearing Tie Trunk Troubles Sheet 5 of 5 4 59 ...
Page 236: ...MAINTENANCE Figure 4 7 Clearing Paging Equipment Troubles ...
Page 250: ...MAINTENANCE Figure 4 9 System Cabinet Backplane Wiring Side Sheet 2 of 2 4 74 ...
Page 251: ...MAINTENANCE Figure 4 10 TDM Signal Designations on Cabinet Backplane 4 75 ...
Page 252: ...MAINTENANCE Figure 4 11 Power Designations on Cabinet Backplane 4 76 ...
Page 263: ...MAINTENANCE Figure 4 12 Clearing Virtual Facilities Troubles Sheet 1 of 3 ...
Page 264: ...MAINTENANCE Figure 4 12 Clearing Virtual Facilities Troubles Sheet 2 of 3 4 87 ...
Page 265: ...MAINTENANCE Figure 4 12 Clearing Virtual Facilities Troubles Sheet 3 of 3 4 88 ...
Page 271: ...MAINTENANCE Figure 4 13 Clearing Switched Loop Attendant Console Troubles Sheet 1 of 5 ...
Page 272: ...MAINTENANCE 4 13 Clearing Switched Loop 2 of 5 Console Troubles Sheet 4 95 ...
Page 273: ...MAINTENANCE Figure 4 13 Clearing Switched 3 of 5 Loop Attendant Console Troubles Sheet 4 96 ...
Page 274: ...MAINTENANCE 4 13 Clearing Switched 4 of 5 Console Troubles 4 97 ...
Page 321: ...APPENDIX E Administration Codes and Data This page is intentionally blank E 2 b ...