INSTALLATION
Make
SIP Connections to Cabinet for 7300H Series Terminals
1.
2.
3.
4.
5.
6.
7.
8.
9.
Select the cable label sheet (Figure 2-7) that identifies the cabinet
(blue for #1, orange for #2, and green for #3).
On an octopus cable, attach an appropriate label (CAB1 SLOT8, for
example) on the last flag-type cable tie and on the back of the hood
of the 25-pair connector.
Connect the 25-pair connector end of the octopus cable to an
appropriate receptacle (ZTN79) on the switch cabinet.
Run the octopus cable horizontally through the D-rings and mount it
on the 50A Fanning Strip as shown in Figure 2-31.
Repeat the previous steps for each ZTN79 receptacle, so that all
octopus cables linking 7300H Series terminals to the cabinet are
labeled and run to the 50A Fanning Strip.
Check the Voice and Data Station Records Form to see which SIP
adapter jacks are connected to 7300H Series terminals.
Connect port 1 of the first ZTN79 to the primary attendant console.
Connect port 2 of the same CP to the primary attendant’s Direct
Extension Selector (DXS) console (if present).
Connect the remaining plugs on the octopus cable to other 7300H
Series terminal SIP jacks. Connect other ZTN79 CPs to other 7300H
Series terminal adapters. Distribute the 34-button Deluxe and BIS
terminals equally among all ZTN79 circuit packs.
Fill in the port ID of each station on the Voice and Data Station
Records Form (Figure 2-26).
November 1995
2-73
Summary of Contents for Network Adapter 25
Page 1: ...AT T AT T System 25 Installation and Maintenance Manual 555 540 103 B November 1995 ...
Page 18: ...APPENDIX F Administration Error Messages GLOSSARY I N D E X F 1 G 1 I 1 viii ...
Page 31: ...INSTALLATION MOUNTING CENTERS WHEN FLANGES ARE OVERLAPPED Figure 2 2 617A Panel 2 7 ...
Page 33: ...INSTALLATION Z21OA1 ADAPTER Y ADAPTER WP90851 L1 858A ADAPTER Figure 2 3 SIP Adapters 2 9 ...
Page 50: ...INSTALLATION Figure 2 10 Three Cabinet System Front View With Covers Removed 2 26 ...
Page 51: ...INSTALLATION Figure 2 11 Position of Shorting Plugs on CPU Memory Circuit Pack 2 27 ...
Page 72: ...INSTALLATION UPPER ADAPTER MOUNTING CLIP Figure 2 18 Mounting Adapters ...
Page 85: ...INSTALLATION 2 61 ...
Page 92: ...INSTALLATION 2 68 ...
Page 103: ...INSTALLATION Figure 2 32 10B Emergency Transfer Unit 2 78 ...
Page 104: ...INSTALLATION Figure 2 33 Emergency Transfer Unit Connections 2 79 ...
Page 109: ...INSTALLATION Figure 2 35 Attendant Console With DXS Console 2 84 ...
Page 146: ...INSTALLATION 2 119b This page intentionally left blank November 1995 ...
Page 153: ...INSTALLATION This page intentionally left blank 2 124b November 1995 ...
Page 223: ...MAINTENANCE Figure 4 2 Clearing Supply Troubles Sheet 1 of 2 4 47 ...
Page 224: ...MAINTENANCE Figure 4 2 Clearing Power Supply Troubles Sheet 2 of 2 ...
Page 225: ...MAINTENANCE Figure 4 3 Clearing CO Trunk Troubles 4 49 ...
Page 226: ...MAINTENANCE Figure 4 4 Clearing 4 Wire Tie Trunk Troubles Sheet 1 of 4 4 50 ...
Page 227: ...MAINTENANCE Figure 4 4 Clearing 4 Wire Tie Trunk Troubles Sheet 2 of 4 4 51 ...
Page 228: ...MAINTENANCE Figure 4 4 Clearing 4 Wire Tie Trunk Troubles Sheet 3 of 4 4 52 ...
Page 229: ...MAINTENANCE Figure 4 4 Clearing 4 Wire Tie Trunk Troubles Sheet 4 of 4 4 53 ...
Page 231: ...Figure 4 6 Clearing Tie Trunk Troubles Sheet 1 of 5 4 55 ...
Page 232: ...MAINTENANCE 6 7 8 9 10 Figure 4 6 Clearing Tie Trunk Troubles Sheet 2 of 5 4 56 ...
Page 233: ...MAINTENANCE Figure 4 6 Clearing Tie Trunk Troubles Sheet 3 of 5 4 57 ...
Page 234: ...MAINTENANCE Figure 4 6 Clearing Tie Trunk Troubles Sheet 4 of 5 4 58 ...
Page 235: ...MAINTENANCE Figure 4 6 Clearing Tie Trunk Troubles Sheet 5 of 5 4 59 ...
Page 236: ...MAINTENANCE Figure 4 7 Clearing Paging Equipment Troubles ...
Page 250: ...MAINTENANCE Figure 4 9 System Cabinet Backplane Wiring Side Sheet 2 of 2 4 74 ...
Page 251: ...MAINTENANCE Figure 4 10 TDM Signal Designations on Cabinet Backplane 4 75 ...
Page 252: ...MAINTENANCE Figure 4 11 Power Designations on Cabinet Backplane 4 76 ...
Page 263: ...MAINTENANCE Figure 4 12 Clearing Virtual Facilities Troubles Sheet 1 of 3 ...
Page 264: ...MAINTENANCE Figure 4 12 Clearing Virtual Facilities Troubles Sheet 2 of 3 4 87 ...
Page 265: ...MAINTENANCE Figure 4 12 Clearing Virtual Facilities Troubles Sheet 3 of 3 4 88 ...
Page 271: ...MAINTENANCE Figure 4 13 Clearing Switched Loop Attendant Console Troubles Sheet 1 of 5 ...
Page 272: ...MAINTENANCE 4 13 Clearing Switched Loop 2 of 5 Console Troubles Sheet 4 95 ...
Page 273: ...MAINTENANCE Figure 4 13 Clearing Switched 3 of 5 Loop Attendant Console Troubles Sheet 4 96 ...
Page 274: ...MAINTENANCE 4 13 Clearing Switched 4 of 5 Console Troubles 4 97 ...
Page 321: ...APPENDIX E Administration Codes and Data This page is intentionally blank E 2 b ...