
2-21
ASUS RS720Q-E6/RS12, RS724Q-E6/RS12
5. Secure the PIKE riser card to the
riser card bracket with two screws.
6. Align and insert the golden fingers
of the PIKE SAS RAID card into
the card slot on the PIKE raiser
card. Ensure the card is completely
seated on the slot.
7. Locate the SGPIO connector on
the side of the server chassis.
8. Connect the SGPIO cable to the
SGPIO connector on the PIKE
Riser card.
Summary of Contents for RS720Q-E6 RS12
Page 1: ...2U Rackmount Server RS720Q E6 RS12 RS724Q E6 RS12 User Guide ...
Page 20: ...Chapter 1 Product introduction 1 10 ...
Page 48: ...4 2 Chapter 4 Motherboard information 4 1 Motherboard layouts Z8NH D12 For RS720Q E6 RS12 ...
Page 49: ...ASUS RS720Q E6 RS12 RS724Q E6 RS12 4 3 Z8PH D12 SE QDR For RS724Q E6 RS12 ...
Page 66: ...4 20 Chapter 4 Motherboard information ...
Page 136: ...6 34 Chapter 6 RAID configuration ...