EN
15
Installation Test
Before commencing the operation, test ASIN AQUA installation.
Most problems result from incorrectly performed installation.
Test
In the “Test of Outputs” menu, gradually start all the pumps and while they are
running, check tightness of all the PE tube connections. Check the injecting
valves for blockage and air bubbles in the PE tube.
Check tightness of all the
connections.
Liquid must reach spraying
and subsequently the tube.
If bubbles occur here, the
pump draws air in. Repair
the connection - disconnect
the tube, cut the end carefully
in 90° angle and plug it back.
Monitor level in the
transparent plastic tube.
WARNING
Any obstacles, bubbles or leaks in the connecting tube will prevent
ASIN AQUA Net from correct operating.
The clear plastic tube allows you
to monitor fl ow of liquid to the injecting valves.
1
2
3
Summary of Contents for ASIN AQUA
Page 1: ...www asekopool com ASIN AQUA ASIN AQUA Net CLF REDOX DOSE CLF REDOX DOSE USER S MANUAL EN...
Page 33: ...EN 33...
Page 34: ...EN 34...
Page 35: ...EN 35...
Page 36: ...www asekopool com ASIN AQUA ASIN AQUA Net USER S MANUAL EN...