AC15QTP And AC20QTP Operations Manual....
28
6.1
POWER TURN-ON PROCEDURE, cont.
6.1.2 Systems Equipped With The Seamless Transfer Option
With the converter in the Standby State (as left at the end of Section 6.1), press the
GENERATOR POWER
(3)
display button. The generator voltage and form will now be
displayed. If two generators are installed, select Generator #1 or Generator #2 by pressing the
F1
(13)
or F2
(13)
button after selecting the GENERATOR metering screen.
NOTE: Unlike the converter and shore power displays, generator load current is not measured
by the system, and as such no data can be displayed for current, kW, or kVA.
To determine generator status at the electrical system, observe the SHIP’S POWER button
group. Two LEDs are included in this group, one next to the SHIP’S POWER - CONVERTER
(9)
button, the other next to the SHIP’S POWER - GENERATOR
(12)
button. The LED
(9A)
next to the CONVERTER button will be lit when the converter is on and supplying power to the
ship’s distribution grid. The LED
(12A)
next to the GENERATOR button will be lit when the
generator is supplying power. The SHIP’S POWER LEDs should never be lit at the same time:
only one source of energy should be connected to the ship’s distribution system at any point in
time. If the GENERATOR LED is lit, but the GENERATOR metering display indicates no
power present, then the GENERATOR is connected to the distribution grid through its circuit
breaker, but the generator is off.
NEVER ASSUME A CIRCUIT IS INACTIVE
(WITHOUT VOLTAGE
) BY RELYING
UPON THE SHORE POWER CONVERTER’S METERING SYSTEM. DO NOT
ACCESS THE ELECTRICAL SYSTEM WITHOUT PROPERLY VERIFYING THE
SAFETY OF THE SITUATION USING ALTERNATE MEANS.