![AsahiAV H-A077-E-00 User Manual Download Page 16](http://html1.mh-extra.com/html/asahiav/h-a077-e-00/h-a077-e-00_user-manual_2980252016.webp)
Installation, Operation and Maintenance Manual
【
H-A077-E-00
】
3-Way Ball valve Type 23 Electric actuated Type Z 15
~
50mm (½”-2”)
15
[Procedure]
1) Loosen the Union nut with a hand.
2) Remove the Union nut and the end connector from the body.
3) Lead the Union nut through the pipe.
4) Make sure the hub part of the End connector is clean with waste
cloth.
5) Apply adhesive evenly to the hub part of the End connector and
the pipe spigot.
(
Refer to
Table 8-3
.
)
6) After applying adhesive, insert the pipe quickly to the End
connector and leave it alone for at least 60 seconds.
7) Wipe away overflowing adhesive.
8) Make sure that the O-ring (A) is properly mounted to the body.
9) Set the End connector directly on the body without allowing
the O-ring (A) to come off.
10) Tighten Union nut on each valve until hand tight.
11) Using a strap wrench tighten Union nuts uniformly on each
side approx. 90°- 180° turns (1/4 to 1/2 turns).
Necessary
items
● Asahi AV cement
● Strap wrench
● Waste cloth
Size
Quantity (g) [oz]
15mm (
½
”)
1.0 [0.035]
20mm (
¾
”)
1.3 [0.046]
25mm (1”)
2.0 [0.071]
32mm (1
¼
”)
2.4 [0.085]
40mm (1
½
”)
3.5 [0.123]
50mm (2”)
4.8 [0.169]
Table 8-3 Adhesive quantity (guideline)
O-ring (A)