BSP
COMX-P40x0 ENP2 Installation and Use (6806800R95B
)
108
U-Boot provides "rcw" utilities to switch SerDes lanes among the twelve SerDes/RCW options.
A checking feature is also supported. Below is a usage sample of the utilities.
The steps below are used to activate specific SerDes/RCW options.
Run "rcw active <option#>" to activate the SerDes/RCW option#.
Power off the board.
For RCW options #7 or #8, a means to change the SERDES clock settings must be provided
by the customer's carrier board.
Power up the board.
rcw list
-
Lists the status of RCW sections
rcw active <option#>
-
active <option#> RCW. <option#> range [1..12]
rcw check current
-
Checks the current RCW with which system boots up
rcw check active
-
Checks the status of the active RCW section
rcw check backup
[option#]
-
Checks the status of all or # backup RCW section(s).
<option#> range [1..12]
Summary of Contents for COMX-P40x0 ENP2
Page 1: ...COMX P40x0 ENP2 Installation and Use P N 6806800R95B August 2014...
Page 8: ...COMX P40x0 ENP2 Installation and Use 6806800R95B 8 List of Tables...
Page 10: ...COMX P40x0 ENP2 Installation and Use 6806800R95B 10 List of Figures...
Page 26: ...Introduction COMX P40x0 ENP2 Installation and Use 6806800R95B 26...
Page 56: ...Controls LEDs and Connectors COMX P40x0 ENP2 Installation and Use 6806800R95B 56...
Page 78: ...Functional Description COMX P40x0 ENP2 Installation and Use 6806800R95B 78...
Page 126: ...Related Documentation COMX P40x0 ENP2 Installation and Use 6806800R95B 126...
Page 128: ...COMX P40x0 ENP2 Installation and Use 6806800R95B Safety Notes 128...
Page 129: ......