
OPERATING AND MAINTENANCE MANUAL FU 321M
24
* Carefully clean all electrical surfaces with the machine disconnected
from the mains.
* Check oil and grease level. Fill if necessary. The regularity of the units
greasing is shown in Fig.8a.
* Check for oil leaks.
* Check that all tubes are well connected and do not present leaks. If any
fault has been detected, take the necessary steps.
* Overall cleaning of the windows of the workspace’s safety-guard and their
exchange, if necessary.
WEEKLY MAINTENANCE
* Continue with the daily maintenance.
* Clean the spindle nose and check for cracks or other visible damage
and that the work holding can be performed smoothly.
MONTHLY MAINTENANCE
* Continue with the weekly maintenance.
* Clean the electrical control.
* Check the machine levelling and that the anchoring bolts are tightly
bolted down.
* Set all slide gib strips if necessary.
* Check the terminals of the electrical connections to see if they have
loosened or become disconnected.
* Drain the coolant and change it every two months.
HALF-YEARLY MAINTENANCE
* Continue with the monthly maintenance.
* Clean the electrical control and the machine.
* Clean the greasing and coolant tanks, and change oil, coolant and
filters if necessary.
* Check the bearings making a noise and change them if necessary.
Summary of Contents for FU 321M
Page 32: ...OPERATING AND MAINTENANCE MANUAL FU 321M 29 ELECTRIC EQUIPMENT DETAILS...
Page 33: ...OPERATING AND MAINTENANCE MANUAL FU 321M 30 ELECTRIC ARRANGEMENT...
Page 34: ...OPERATING AND MAINTENANCE MANUAL FU 321M 31 BUTTON ARRANGEMENT FRONT PANEL 10...
Page 35: ...OPERATING AND MAINTENANCE MANUAL FU 321M 32 BUTTON ARRANGEMENT SIDE PANEL WARNING...
Page 39: ...OPERATING AND MAINTENANCE MANUAL FU 321M 36 Fig 3a 45 41 46 51 48 43 52 44 42 53 49 50 47...
Page 40: ...OPERATING AND MAINTENANCE MANUAL FU 321M 37 SEMI AUTOMATIC CYCLE...
Page 43: ...OPERATING AND MAINTENANCE MANUAL FU 321M 40 Fig 6 1 2...
Page 46: ...OPERATING AND MAINTENANCE MANUAL FU 321M 43 Fig 10 4 3 2 1...
Page 52: ...OPERATING AND MAINTENANCE MANUAL FU 321M 49 Fig 16 3 ELECTRIC CIRCUIT DIAGRAM...
Page 57: ...OPERATING AND MAINTENANCE MANUAL FU 321M 54 Fig 18 3 4 1 2 1 1 1 1 1 1 7 5 6 1 1...
Page 60: ...OPERATING AND MAINTENANCE MANUAL FU 321M 57 Fig 21 OPERATOR S WORKING POSITION ON THE MACHINE...
Page 62: ...OPERATING AND MAINTENANCE MANUAL FU 321M 59 Fig 23 MARKING ON THE PACKING 2170 2370...
Page 63: ...OPERATING AND MAINTENANCE MANUAL FU 321M 60 Fig 24 DIGITAL READOUT SYSTEM...