5-8
Instructions for use and warnings
CHAPTER 5 - Transport and installation
5.4 Connections
To start the machine, it must be properly connected to the local networks:
•
electrical connection
(including connection to the earthing system),
•
compressed air connection
,
in compliance with the regulations in force in the country of installation.
It might also be necessary to connect the machine to the
lan.
It is the user’s responsibility to guarantee the requested connection characteristics.
CaUTion!
The connections requested must be set up by qualified and authorised staff.
5.5 Electrical connection
CaUTion!
Before doing any electrical connections, it is important to ensure that the machine is turned off.
CaUTion!
Make sure the customer’s power supply has already been disconnected.
The buyer is responsible for compliance of the connection between the machine and the earthing system.
CaUTion!
The operation must only be carried out by specialised and authorised staff (electrical maintenance
technician).
Before proceeding with the
electrical connection
, ensure that:
• the maintenance technician is fully aware of the regulations in force in the country of installation;
• the frequency and power input values of the machine match the mains values;
• the cross-section of the electric cables is adequate for the power consumption;
• the power line can withstand the maximum machine power consumptions;
• earthing of the circuit complies with
En 60204-1
;
• the materials used in the earthing system have adequate strength or adequate mechanical protection.
CaUTion!
Do not work with wet hands or objects. In case of fire, do not use water on the electrical components.
Summary of Contents for FlexiBowl 350
Page 6: ...0 6 Instructions for use and warnings TABLE OF CONTENTS PAGE INTENTIONALLY LEFT BLANK...
Page 24: ...3 6 Instructions for use and warnings CHAPTER 3 Safety measures PAGE INTENTIONALLY LEFT BLANK...
Page 82: ...9 2 Instructions for use and warnings CHAPTER 9 Attachments PAGE INTENTIONALLY LEFT BLANK...