第
13
页 共
18
页
4、连接好飞控动力电调线,由于 K++飞控电调线线束不够长,需使用电调延长线。连接飞控其他附属
线束,以便于下一层安装。注意 LED 灯及天线、摄像头线束需要穿过主碳管臂安装在固定位置。
4. Connect the flight control power ESC cable. Because the K ++ flight control ESC wiring
harness is not long enough, you need to use an ESC extension cable. Connect the other
auxiliary harnesses of the flight controller to facilitate the next layer installation. Note that the
LED light, antenna, and camera wiring harness need to be installed in a fixed position through
the main carbon tube arm.
5、第二层用于安装 PMU 以及接收机、雷达模块等设备,如需安装前后避障、仿地等雷达,则需要安
装雷达仓。
5. The second layer is used to install PMU, receiver, radar module and other equipment. If you
need to install radars such as obstacle avoidance, ground imitation, etc., you need to install a
Radar Silo.
6、飞控仓第三层用于安装 RTK 或其他设备,注意 RTK 天线需穿过主碳管臂
6. The third layer of the flight control warehouse is used to install RTK or other equipment.
Note that the RTK antenna needs to pass through the main carbon tube arm.