0MNA080A55-GB REV 01 page 9 / 75
1. Preliminary
operations
1.1
Removing the packaging and positioning the device
On delivery, the packaging must be inspected to ensure that it is whole and that it has not been crushed or dented.
Check in particular that neither of the two impact resistant devices on the packaging is red; if one of them is red,
follow the instructions on the packaging.
The essential details of the device are provided on the shipping document. The marking, weight and dimensions of
the various items making up the packing list are shown.
Check the state of the device by means of a visual inspection of both the inside and the outside. Any dents seen
mean that it has suffered knocks during shipping, which could compromise the normal operation of the device.
1.2 Storage
In the following situations:
-
installation not immediately after delivery;
-
de-installation and storage while awaiting relocation,
place the device in covered premises that are protected from direct contact with atmospheric agents and dust. The
following environmental values are those allowed in the storage area:
Temperature:
-25 ÷ + 75 °C
Relative humidity:
30÷95 % max.