34
001
-005
53
-E
N
r
e
v. 5
Fig. 32
7)
Install the DPS or spreader bar (see “Service Procedure 20 - Replacing the DPS/Spreader Bar
from a Load Cell”) and slide the boom end cap in place over the fasteners.
8)
Install the scale on the boom.
9)
Assemble the actuator to the boom.
10) Perform a full feature test as as per service procedure 4.
11) Perform a safe working load test as per service procedure 22.
12) Perform the anti-crush system test as per the “Verifying the Anti-Crush System” service
procedure (SP5).
NOTE: If the boom is reassembled using an attachement with a shoulder bolt, make sure to
secure the shoulder bolt with Loctite 243 and the stover locknut. Tighten securely to 20 N•m
(15 lbf•ft).
Warning: If the boom is disassembled, it is essential that all components are reinstalled correctly.
If not, the consequence may be later disengagement, which can lead to death or serious injury.