001-1
1900-EN rev
. 5
Assembling the Semi-Permanent Rack
11
Installing the Charger Station
This section does not apply for tracks using portable
lifts.
1) Determine the best suitable location for the lift
to be placed when it is not being used.
2) Align the bottom hooks of the charger station
clip to the lower groove on the track.
3) Push on the top portion of the charger station
clip to make it snap onto the track.
4) Route the charger cable onto the upper track
channel and connect it to an AC power plug.
Fig. 18
1
2
3