9
Installation
Legend:
A = Central Heating Flow (3/4”)
B = Domestic Hot Water Outlet (1/2”)
C = Gas Inlet (3/4”)
D = Domestic Cold Water Inlet (1/2”)
E = Central Heating Return (3/4”)
6.3
Overall Dimensions
F
IG
. 6.1
QT002A
F
IG
. 6.2
DM001B
In order to allo w access to the inter ior of the boiler f or maintenance
purposes, the boiler m ust be installed in compliance with the mini-
mum clearances indicated in
F
IG
. 6.2
6.4
Clearances
F
IG
. 6.3
After removing the boiler from its packaging, remove the template
from the separate box containing the connection kit.
Note: Pay particular attention to any test water that may spill from
the appliance.
6.5
M
OUNTING THE
A
PPLIANCE
Place the template in the position the appliance is to be mounted
and after ensuring it is hanging squarely, use it to dr ill the holes
for the hanging bracket and flue pipe(s)
NB: For further informa-
tion relating to the flue installation please refer to Section
6.9 Flue
Connection. (If the appliance is to be fitted on a w
all of com-
bustible material, the wall
must be protected by a sheet of fire-
proof material).
If the appliance is to be fitted into a timber fr amed building, guid-
ance should be sought from the IGE document R
EF
: IGE/UP/7.
Summary of Contents for INTESA TP23
Page 44: ...44 Fault Finding...
Page 45: ...45 Fault Finding...
Page 46: ...46 Fault Finding 0 55mbar 23kW 0 90mbar 30kW 0 55mbar 23kW 0 90mbar 30kW...
Page 47: ...47 Fault Finding...
Page 50: ...50...
Page 51: ...51...