41
commissioning
C
hec
k
ing
the
gas
settings
Remove the front casing and proceed as described below.
S
upp
l
y
pressure
chec
k
1. Loosen screw “1” (Fig. a) and insert the pressure gauge connection
pipe into the pipe tap.
2. Switch the boiler on at maximum power, enabling the “fl ue
sweep” function (press the
button for 5 seconds; the
display will show “t -- “). The supply pressure should correspond
to the value established in relation to the type of gas for which
the boiler is designed.
3. When the check is over, tighten screw “1” and make sure it is
securely in place.
4. The “fl ue sweep function” is automatically deactivated after 10
minutes or when the
button is pressed.
C
hec
k
ing
the
D
.H.W.
ma
x
imum
po
w
er
1. To check the maximum power level, loosen screw “2” (Fig. b) and
insert the pressure gauge connection pipe into the pipe tap.
2. Disconnect the air chamber compensation tube.
3. Switch the boiler on at maximum power, enabling the “fl ue
sweep” function (press the
button for 5 seconds; the
display shows “t -- “); press the programming key
to activate
operation at the maximum hot water power level. The display
will show “t -- “.
The supply pressure should correspond to the value shown in
the “Gas Settings” table, in relation to the type of gas for which
the boiler is designed. If it does not correspond, remove the
protective hood and tighten or loosen the adjustment screw “3”
(fi g. c).
4. When the check is over, tighten screw “2” and make sure it is
securely in place.
5. Replace the cover protecting the modulator.
6. Reconnect the compensation tube.
7. The “fl ue sweep function” is automatically deactivated after 10
minutes or when the
button is pressed.
C
hec
k
ing
the
minimum
po
w
er
1. To check the minimum power level, loosen screw “2” (Fig. b) and
insert the pressure gauge connection pipe into the pipe tap.
2. Disconnect the air chamber compensation tube.
3. Switch the boiler on at maximum power, enabling the “fl ue
sweep” function (press the
button for 10 seconds; the
display shows “t -- “); press the programming key
to activate
operation at the minimum hot water power level. The display will
show “t __ “.
Disconnect a wire from the modulator (fi g. d); the supply pressure
should correspond to the value shown in the “Gas Settings” table,
in relation to the type of gas for which the boiler is designed. If it
does not correspond, tighten or loosen the adjustment screw “4”
(fi g. d).
4. When the check is over, tighten screw “2” and make sure it is
securely in place.
5. Reconnect the modulator wire.
6. Reconnect the compensation tube.
7. The “fl ue sweep function” is automatically deactivated after 10
minutes or when the
button is pressed.
1
(a)
3
(c)
2
(b)
4
(d)
Summary of Contents for CLAS B 28 FF
Page 1: ...Installation and Service Instructions CLAS B ...
Page 2: ......
Page 3: ...3 总 则 ...
Page 4: ...4 1 2 3 4 5 6 7 8 15 14 13 12 11 10 9 ...
Page 5: ...ø ø ø ø ø ø ø 312 ...
Page 6: ......
Page 7: ......
Page 8: ......
Page 9: ...安装 水路系统图 ...
Page 10: ...安装 单独 ...
Page 11: ...ø ø ø ø ø 28 ...
Page 12: ... ...
Page 13: ......
Page 14: ......
Page 15: ...15 1 a 3 c 2 b 4 d 试运行 燃气设置的检查 ...
Page 16: ......
Page 18: ...18 ...
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 54: ......
Page 55: ......